O p e r a t i n g I n s t r u c t i o n s
|
KBL 5800
40
Maintenance intervals
Component/
wearing part
Cleaning/care
Replacement
Condensate
tank
Check the
fi lling level daily
and empty, if
necessary.
When
necessary
Tubes and
starters,
inductive units
Tubes after
approx. 200
operating hours
After 500 -
600 operating
hours
Tubes and
starters, CPI-
equipped units
Tubes after
approx. 200
operating hours
Tube
operation:
•
Set level I:
after 1200
operating
hours
•
Set level II:
after 1000
operating
hours
•
Set level III:
after 800
operating
hours
Facial tanners
When necessary
After approx.
500 - 600
hours
Acrylic panes
When necessary
After approx.
3000 hours
aquaCool
nozzles
When necessary
After approx.
1000 hours
Shoulder
tanner
When necessary
After approx.
600 hours
Ropes of the
canopy drive
Check and
grease after 500
- 600 hours.
Replace all
ropes after
3000 hours.
Air hoses
Check after 500
- 600 hours.
When
necessary
Air-
conditioning
unit
Clean the heat
exchangers
after 500 - 600
hours and check
the condensate
pump.
When
necessary
LOCKING THE CANOPY IN PLACE
To
facilitate
many
maintenance and service
procedures, the canopy can
be locked in place (fi xed) in
its upper position. Turn the
lever on the left-hand side to
the left. When the canopy is
then lifted, it will be locked in place. You can unblock
it by turning the lever to the right. After the screws on
the right-hand and left-hand side have been removed,
the bed pane can be attached to the canopy.
Acrylic panes
CANOPY PANE AND SIDE PANE
The following table describes how to dismantle the
acrylic panes.
Procedure
Fig.
1
Lock the canopy in place.
2
Remove the screws and fold the canopy
pane and / or the side pane down.
40.1
40.2
3
If necessary, the pane can be removed
from the hinge profi le when it is in its
lowest position.
4
The assembly is carried out in reverse
order. Make sure that the frame is
correctly positioned in the hinge
profi le.
5
When closing the canopy pane, ensure
that all air nozzles exactly match their
counterparts. If not, carefully push
the nozzles concerned in their correct
positions.
6
Unblock the canopy.
Summary of Contents for megaSun 5800
Page 1: ...Operating Instructions...
Page 56: ...O p e r a t i n g I n s t r u c t i o n s KBL 5800 56 Views 92 91 74 22 49 61 58 27...
Page 58: ...O p e r a t i n g I n s t r u c t i o n s KBL 5800 58 Remarks...
Page 59: ...O p e r a t i n g I n s t r u c t i o n s KBL 5800 59 Remarks...
Page 60: ...KBL AG Ringstra e 24 26 56307 Dernbach Germany fon 49 0 26 89 94 26 0 fax 49 0 26 89 94 26 66...