28
10 TEST RUN AND FINAL CHECK
10.1 Check item table after installation
Table 10-1
Checking item
Description
Yes
No
Whether installing site is meet
for requirements
Units are fixed mounting on level base.
Ventilating space for heat exchanger at the air side is meeting for requirement
Maintenance space is meeting for requirement.
Noise and vibration is meeting for requirement.
Sun radiation and rain or snow proof measures are meeting for requirements.
External physical is meeting for requirement.
Whether water system is
meeting for requirements
Pipe diameter is meeting for requirement
The length of system is meeting for requirement
Water discharge is meeting for requirement
Water quality control is meeting for requirement
Flexible tube’s interface is meeting for requirement
Pressure control is meeting for requirement
Thermal insulation is meeting for requirement
Wire capacity is meeting for requirement
Switch capacity is meeting for requirement
Fuse capacity is meeting for requirement
Voltage and frequency are meeting for requirement
Whether electric wiring system
is meeting for requirements
Connecting tightly between wires
Operation control device is meeting for requirement
Safety device is meeting for requirement
Chained control is meeting for requirement
Phase sequence of power supply is meeting for requirement
10.2 Trial run
1) Start up the controller and check whether the unit displays a fault code. If a fault occurs, remove the fault first, and start the unit
according to the operating method in the “unit control instruction”, after determining that there is no fault existing in the unit.
2) Conduct trial run for 30 min. When the influent and effluent temperature becomes stabilized, adjust the water flow to nominal
value, to ensure normal operation of the unit.
3) After the unit is shut down, it should be put into operation 10 minutes later, to avoid frequent start-up of the unit. In the end, check
whether the unit meets the requirements according to the contents in Table 11-1.
• The unit can control start-up and shut-down of the unit, so when the water system is flushed, the operation of the pump
should not be controlled by the unit.
• Do not start up the unit before draining the water system completely.
• The target flow controller must be installed correctly. The wires of the target flow controller must be connected according
to electric control schematic diagram, or the faults caused by water breaking while the unit is in operation should be the
user’s responsibility.
• Do not re-start the unit within 10 min after the unit is shut down during trial run.
• When the unit is used frequently, do not cut off the power supply after the unit is shut down; otherwise the compressor
cannot be heated, thus leading to its damages.
• If the unit is not in service for a long time, and the power supply needs to be cut off, the unit should be connected to the
power supply 12 hours prior to re-starting of the unit, to pre-heat the compressor, the pump, the plate heat exchanger
and the differential pressure value.
CAUTION
Summary of Contents for KEM-HT-65 DRS5
Page 56: ...16127100001537 V B ...
Page 57: ......