5 Installing the unit
48
5.8 External warning light (optional)
NOTICE! External max. 230V warning light can be
connected only by doing internal modifications. Only
authorized technician is allowed to do this.
NOTICE!
These instructions are intended only for the
remote exposure button assembly (207502).
NOTICE! 12V voltage is supplied from the unit for the
external warning light. Do not connect any external
voltages to this connection.
1.
Attach the device end of the remote controller cable
(207264) to its place and tighten the strain relief.
2.
Connect the remote controllers cable connector J1004
to its place.
3.
Make sure that correct F3 fuse
(T2A, 250V,
Interrupting rating 100A@250Vac 10KA@125Vac,
6,3 x 3,2 mm, UR, CSA)
is in the units F3 fuse holder.
1. External warning light cable
2. Strain relief
3. Cable connection J1004
4. Fuse holder F3
Summary of Contents for ORTHOPANTOMOGRAPH OP 3D Pro
Page 2: ......
Page 4: ......
Page 8: ...iv rev...
Page 18: ...1 Introduction 10...
Page 27: ...2 Unit description 19 2 6 Unit movements Panoramic unit movements R C J D...
Page 29: ...2 Unit description 21...
Page 30: ...2 Unit description 22...
Page 38: ...4 PC requirements 30...
Page 54: ...5 Installing the unit 46 4 Fasten the covers...
Page 67: ...5 Installing the unit 59 C C D D Top cover of the column E E...
Page 104: ...7 Cephalometric calibration and alignment 96...
Page 111: ...7 Cephalometric calibration and alignment 103 3 Tighten the locking nut...
Page 117: ...7 Cephalometric calibration and alignment 109...
Page 128: ...8 Special procedures 120 6 Remove the arm from the column 4 nuts 7 Disassemble the arm...
Page 132: ...8 Special procedures 124 right handed assembly Prism assembly for the left handed cephalostat...
Page 158: ...8 Special procedures 150...
Page 165: ...9 OP 3D Pro Pre sales check list 157 9 11 Notes comments...
Page 166: ...9 OP 3D Pro Pre sales check list 158 9 12 Dimensions 463...
Page 167: ...9 OP 3D Pro Pre sales check list 159 9 13 Dimensions with cephalostat...