Operating Manual
18
Original Operating Manual
Daily
Check all lines, hoses and connections for leakage and damage.
Ensure that all fork safety retaining stops (1) are present and undamaged.
After 50h / every 500h thereafter
Check screws:
(2) on the hooks (3).
(4) on the fork safety retaining stops (1).
Replace loose or damaged screws. Torque the screws as specified in Chapter
6.1 General.
Weekly
Grease:
Sliding pieces (5) by way of the greasing nipples (8).
Supporting rollers on the lower hooks (7) (option):
The supporting rollers in the standard version are maintenance-free.
Every 200h
Check wear on:
Sliding pieces (5).
Supporting rollers (8).
As necessary
Renew worn sliders (5) by removing the screws (2) of the hooks (3). Use
appropriate lifting equipment to lift the fork carriage (9) off the fork carriage base
of the lift truck. Replace the sliding pieces (5). Ensure correct seating of the
sliding pieces (5) during installation. Use appropriate lifting equipment to lower
the fork carriage (9) onto the fork carriage base of the lift truck from above and
use the screws (2) to secure the hooks (3).
Renew defective support rollers (8) in the hooks (3) by removing the screws (2)
for the hooks (3). Tilt the fork carriage (9) forward and off the fork carriage of the
lift truck so that the support roller (8) no longer rests, and secure this position.
Remove the pin in the hooks (3), remove the defective support rollers (8) and
replace them with new support rollers. Tilt the fork carrier (9) back onto the fork
carriage of the lift truck and install the hook (3) using the screw (2).
Renew the defective cylinder (10) by removing the nuts (11). Replace the
defective cylinder (10) and put the nuts (11) back on.