
uBreakiFix Fixture Install & Maintenance Guide
6
STEP 1
Locate the legs, short and long metal cross members.
STEP 2
Bolt the short cross member between the legs using
the provided carriage bolts (D).
STEP 3
Bolt the long cross member onto the middle of the
short cross member with provided carriage bolts (E).
STEP 4
Fasten the long cross member onto the tall cabinet
using the provided hardware (F). Adjust the leveling
feet in the base of the legs until level.
STEP 1
Carefully lift and set the drawer unit onto the metal
leg assembly, and the ledge of the tall cabinet.
STEP 2
Remove all drawers for access to bolt holes.
STEP 3
Attach the table legs to the drawer unit using the
provided hardware (G).
STEP 4
Align the table leg holes, and the holes in the tall
cabinet. Use provided bolts to fasten (H).
ASSEMBLING THE METAL TABLE BASE
DRAWER UNIT ASSEMBLY
Summary of Contents for asurion uBreakiFix Fixture
Page 16: ......
Page 17: ......
Page 19: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 28: ...Short Cabinet Workbench Drawer Assembly Workbench Co mm un ity Wa ll Bo x Fra me s ...
Page 29: ...Glass Panels K Wall Frames K Wall Frames Drawer Assembly Workbench Tech Gallery Panels ...
Page 30: ...Co mm un ity Wa ll Bo x Fra me s Tech Gallery Panels ...
Page 31: ...uBreakiFix Fixture Install Maintenance Guide 31 ...