4
Receiving Your Unit
Acceptance of Shipment
Every part of your cleaning unit was carefully checked,
tested, and inspected before it left our manufacturing
plant.
Upon receiving the unit, make the following
acceptance check:
1.
The unit should not show any outward signs of
damage. If damaged, notify the common carrier
immediately.
2.
Check your equipment and packing list. The stan-
dard cleaning unit should arrive equipped with the
following items (unless otherwise specified) and
any optional accessories which were ordered:
Equipment List
1.
Console.
2.
Waste tank
3.
Fuel pump assembly
4.
100 ft. of 2" vacuum hose.
5.
1 vacuum hose connector.
6.
100 ft. of 1/4" solution pressure hose with quick
connects.
7.
50 ft. water supply hose with quick connect.
8.
Installation bolting kit.
9.
Installation mounting plates.
10. Operation and service manual for engine, water
pump, and vacuum pump.
11. Hose clamps for vacuum hoses.
86411120 Manual Operators - Peak GTX2 Prochem
Summary of Contents for PROCHEM Peak GTX2
Page 2: ...This page left intentionally blank...
Page 15: ...13 Notes 86411120 Manual Operators Peak GTX2 Prochem...
Page 58: ......
Page 68: ...10 Side Panel 2 1 86411130 Spare Parts List Peak GTX2 Prochem...
Page 100: ...42 Battery Floor Mount 10 9 8 7 6 5 4 3 1 2 86411130 Spare Parts List Peak GTX2 Prochem...
Page 102: ...44 Chemical Jug Floor Mount 5 2 4 1 6 3 86411130 Spare Parts List Peak GTX2 Prochem...
Page 104: ...46 Wiring Diagram 86411130 Spare Parts List Peak GTX2 Prochem...
Page 106: ...48 Notes 86411130 Spare Parts List Peak GTX2 Prochem...
Page 107: ...49 OPTIONS Options...
Page 110: ...52 Exhaust Optional 2 3 4 1 5 86411130 Spare Parts List Peak GTX2 Prochem...