17
Installation
Layout with 100 Gallon Waste Tank
TOP VIEW
FRONT VIEW
ENSURE THAT VAC INLETS ON CONSOLE
AND WASTE TANK ARE ALIGNED.
49
1
8
"
1
2
"
2X 12
3
8
"
2X 6
3
16
"
2X 1
1
2
"
6X Ø
3
8
"
3
3
4
" MIN.
2X 1
7
8
"
2X 19
5
8
"
2X 36
1
4
"
67
13
16
"
6X Ø
3
8
"
11
16
"
42
3
4
" OVERALL HEIGHT
39
3
8
" WASTE TANK
39
15
16
" CONSOLE
50
1
8
" WASTE TANK
BACK OF DRIVERS SEAT
IN REAR MOST POSITION.
29
3
8
"
13
7
8
"
7
11
16
"
5
7
8
"
86411120 Manual Operators - Peak GTX2 Prochem
Summary of Contents for PROCHEM Peak GTX2
Page 2: ...This page left intentionally blank...
Page 15: ...13 Notes 86411120 Manual Operators Peak GTX2 Prochem...
Page 58: ......
Page 68: ...10 Side Panel 2 1 86411130 Spare Parts List Peak GTX2 Prochem...
Page 100: ...42 Battery Floor Mount 10 9 8 7 6 5 4 3 1 2 86411130 Spare Parts List Peak GTX2 Prochem...
Page 102: ...44 Chemical Jug Floor Mount 5 2 4 1 6 3 86411130 Spare Parts List Peak GTX2 Prochem...
Page 104: ...46 Wiring Diagram 86411130 Spare Parts List Peak GTX2 Prochem...
Page 106: ...48 Notes 86411130 Spare Parts List Peak GTX2 Prochem...
Page 107: ...49 OPTIONS Options...
Page 110: ...52 Exhaust Optional 2 3 4 1 5 86411130 Spare Parts List Peak GTX2 Prochem...