50
Basic Settings and Service Procedures
ICC 1 S D
Hydraulic System – Checking working pressures (continued)
1
Pressure-side connection
2
T-joint
3
Pressure line to control block, side
console
4
Testing set (special tool)
5
Hydraulic pump, side brushes and
debris container
Checking hydraulic pressure for side brushes
and debris container
–
Unscrew pressure line to control block (3)
from pressure-side connection (1).
–
Install T-joint (2) between pressure-side
connection (1) and pressure line (3).
–
Install testing set (4) on T-joint (2).
–
Start engine, and run at full throttle.
–
Raise side brush cylinders until they rest
against the stops.
–
With side brushes engaged and rotating, a
pressure of 60 to 80 bar must be indicated on
testing gauge.
–
For adjustment of pressure relief valve, refer
to page 51.
50
S
Bar
200
250
100
150
1
2
3
4
5
Summary of Contents for ICC 1 S D
Page 1: ...ICC 1 S D 1 142 Service Manual 5 905 432 03 01...
Page 20: ...20 Unit Functions ICC 1 S D Equipment Features Engine compartment view from rear...
Page 60: ...60 CircuitDiagram ICC 1 S D Circuit diagram 0 088 215 page 2...
Page 66: ...66 Hydraulic Block Diagram ICC 1 S D Hydraulic block diagram 0 088 258...
Page 68: ...68 Hydraulic Line Diagram ICC 1 S D Hydraulic line diagram 2 706 010...