5.959-373 A 2006471 (06/03)
English
CWP 2000
Operating Instructions
I.4
Preparing the system for use
n
Fill up containers for shampoo / foam (5.1) and drying
aid (5.2) at pillar 2
n
Bleed metering pumps (6):
– start metering pumps as described in Chapter F
– open bypass valves (c) in the metering pumps to be
bled. Wait until there are no longer any air bubbles
being passed through
– close bypass valves
– stop metering pumps.
n
Functional test on the entire system
– check every manual function
– inspect wash brushes for correct rotational direction
– check each wash programme for each type of
vehicle at least once.
n
Instruct personnel of the operating company.
i
Important!
Satisfy yourself that the service personnel have correctly
understood all instructions.
For technical personnel only
I
System installation