
42
Maintenance
Preparation for Loading/Unloading Trailer
Before loading or unloading machine from trailer, brush deck must be in the up position.
When transporting the machine on a trailer or in a truck, in addition to using tie-downs, be sure to block the tires to
prevent the machine from rolling.
Machine Tie-Downs
There are two tie points located in front of the rear wheels on the frame, and a Tie-down wrap point on the vacuum
bag housing. Tie-down devices must be of the proper type and strength. The combined strength of all tie-downs
must be strong enough to lift two times the weight of the machine. Tie-downs must be positioned to prevent the
machine from moving forward, backward, or either side to side. Use all four corners of the machine with the tie-
downs running out opposite directions. Tie-downs must be attached to the transporting vehicle securely.
CONNECT
AT
FRAME
VIEW FROM
BOTTOM
Recommended Tie-Down Points
VACUUM
BAG HOUSING
8.644-676.0 Operator’s Manual - iVac 24 ATV
Summary of Contents for Chariot 2 iVACUUM 24 130 A/H
Page 14: ...14 Operations Drive Controls 1 2 3 4 5 6 7 8 9 10 8 644 676 0 Operator s Manual iVac 24 ATV ...
Page 46: ...46 Suggested Spare Parts 8 644 676 0 Operator s Manual iVac 24 ATV ...
Page 90: ...44 Sugerido De Piezas Sueltas 8 644 676 0 Operator s Manual iVac 24 ATV ...
Page 91: ...45 Notes 8 644 676 0 Operator s Manual iVac 24 ATV ...