INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AP-H
PAGE 303
JUL 24/2013
3. RCP operational tests
Check correct operation of RCP LED and external buzzer by switching ELT and
RCP as described in the sequential procedure hereunder (with ELT switch in
the "ARM" position).
Figure 301: RCP LED and buzzer operation
IMPORTANT: (2) before switching the RCP to ON, wait for the end of the
self-test.