INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AP-H
PAGE 302
JUL 24/2013
2. ELT operational tests
A. Installation without programming dongle
• connect RCP to J1 and outside antenna to J2;
• switch the ELT from OFF to ARM;
• check that the Self-Test result is OK (one long flash).
B. Installation with Programming Dongle
• connect the outside antenna to J2;
• switch the ELT from OFF to ARM;
• check that the Self-Test fails (3+4 flashes);
• if not, connect a maintenance dongle to J1:
- Switch the ELT from OFF to ARM;
- Check that the Self-Test fails (3+4 flashes);
- Remove the maintenance dongle from J1.
• connect the "Programming Dongle" to J1;
• switch the ELT from OFF to ARM:
the buzzer operates during the whole self-test procedure, after a few
seconds the LED displays the result.
• check that the Self-Test result is OK (one long flash).