background image

                                      

                                             

Owners’ m

anual

 

|

 

NANO MAR  SYSTEM | January 1, 2023 | version 1.0   page 8

 

 

 

 

9.6

 

E

XTINGUISHING RELEASED

 

The  red  extinguishing  released  indicator  lights  continuously  when  the  extinguishers  are  activated. 
This extinguishing release indicator lights up after ending of the configured extinguishing delay time, 
or when the two extinguishing release buttons on the front or the external release button is activated. 

9.7

 

E

XTINGUISHING DELAYED 

 

The red extinguishing delayed indicator indicates that the extinguishing release delay is active. This 
indicator flash when the delay time is running.  

9.8

 

G

ENERAL FAULT

 

General fault indicator lights and specific fault indicators flash. This yellow fault indicator will light 
continuously at any fault condition or power malfunction. 

9.9

 

F

IRE ZONE FAULT

 

When the NANO control panel has detected an error in one of the critical fire detection paths of the 
system, the specific yellow zone fault indicator flash and the general fault indicator lights up.  

9.10

 

E

XTINGUISHING RELEASE HOLD 

 

The yellow hold indicator flash and a different tone sounds as long the hold button on the panel front, 
or the external hold button is pressed.  

9.11

 

E

XTINGUISHING RELEASE FAULT

 

This yellow indicator lights up continuously when a critical fault is detected (open or short circuit) in 
the extinguishing output line.  

9.12

 

I

NTERNAL FAULT INDICATORS

 

There are three extra yellow fault indicators on the internal electronic PCB, meant for second 
priority fault messages and these indicators will flash.  

 

Summary of Contents for NANO MARINE

Page 1: ...www KG Groep com January 1 2023 version 1 0 Owner s manual NANO MARINE FIRE DETECTION EXTINGUISHING CONTROL SYSTEM...

Page 2: ...6 EXTINGUISHING RELEASE 6 9 LED INDICATORS 7 9 1 MANUAL RELEASE ONLY 7 9 2 AUTOMATIC MANUAL RELEASE 7 9 3 POWER 7 9 4 COMMON FIRE 7 9 5 FIRE ZONE ALARM 7 9 6 EXTINGUISHING RELEASED 8 9 7 EXTINGUISHING...

Page 3: ...abinets engine rooms in vessels yachts and other small areas or equipment The NANO MAR SYSTEM continuously senses its inputs and in the event of a fire gives the correct output to enable a product spe...

Page 4: ...depending on the DIP switch time settings In a marine application it is NOT common for a fire suppression system intended for an engine room to be released by an automatic fire detector But the NANO c...

Page 5: ...nt of a complete power failure the general fault relay becomes inactive 6 7 VFC FIRE RELAY ACTIVE IN SINGLE OF DUAL MODE ALARM A single or dual FIRE indication can trigger the VFC relay You can choice...

Page 6: ...d button as long this button is pressed the extinguishing release sequence will be halted and cause the yellow hold activated indicator flash Release the Hold button shall re start the countdown relea...

Page 7: ...differently indicating an abnormality in the power supply to the NANO control panel When starting the NANO MAR SYSTEM after a power failure or an extinguishers release the green power LED on the NANO...

Page 8: ...ators flash This yellow fault indicator will light continuously at any fault condition or power malfunction 9 9 FIRE ZONE FAULT When the NANO control panel has detected an error in one of the critical...

Page 9: ...m Note the time the fire alarm occurred and log the fire event in the logbook 11 2 WHAT TO DO IN THE EVENT OF A FAULT CONDITION Note the indications on the front of the NANO control panel Note the tim...

Page 10: ...sconnect extinguisher MOVE the disconnect switch of all in the YES position and the aerosol extinguisher is disabled and can not be activated A disablement will be signalized as fault on the NANO cont...

Page 11: ...ystem according to the instructions of the supplier 12 4QUARTERLY TESTING COMPETENT PERSON To be conducted by the Competent Person Included as reference for the Premises Management Check all previous...

Page 12: ...itness for a particular purpose It is the responsibility of the premises management to define the fire procedures and ensure that all relevant users are trained and that fire drills are performed with...

Reviews: