www.KG-Groep.com | January 1, 2023 | version 1.0
Owner
’
s manual
NANO MARINE
FIRE DETECTION
EXTINGUISHING
CONTROL SYSTEM
Page 1: ...www KG Groep com January 1 2023 version 1 0 Owner s manual NANO MARINE FIRE DETECTION EXTINGUISHING CONTROL SYSTEM...
Page 2: ...6 EXTINGUISHING RELEASE 6 9 LED INDICATORS 7 9 1 MANUAL RELEASE ONLY 7 9 2 AUTOMATIC MANUAL RELEASE 7 9 3 POWER 7 9 4 COMMON FIRE 7 9 5 FIRE ZONE ALARM 7 9 6 EXTINGUISHING RELEASED 8 9 7 EXTINGUISHING...
Page 3: ...abinets engine rooms in vessels yachts and other small areas or equipment The NANO MAR SYSTEM continuously senses its inputs and in the event of a fire gives the correct output to enable a product spe...
Page 4: ...depending on the DIP switch time settings In a marine application it is NOT common for a fire suppression system intended for an engine room to be released by an automatic fire detector But the NANO c...
Page 5: ...nt of a complete power failure the general fault relay becomes inactive 6 7 VFC FIRE RELAY ACTIVE IN SINGLE OF DUAL MODE ALARM A single or dual FIRE indication can trigger the VFC relay You can choice...
Page 6: ...d button as long this button is pressed the extinguishing release sequence will be halted and cause the yellow hold activated indicator flash Release the Hold button shall re start the countdown relea...
Page 7: ...differently indicating an abnormality in the power supply to the NANO control panel When starting the NANO MAR SYSTEM after a power failure or an extinguishers release the green power LED on the NANO...
Page 8: ...ators flash This yellow fault indicator will light continuously at any fault condition or power malfunction 9 9 FIRE ZONE FAULT When the NANO control panel has detected an error in one of the critical...
Page 9: ...m Note the time the fire alarm occurred and log the fire event in the logbook 11 2 WHAT TO DO IN THE EVENT OF A FAULT CONDITION Note the indications on the front of the NANO control panel Note the tim...
Page 10: ...sconnect extinguisher MOVE the disconnect switch of all in the YES position and the aerosol extinguisher is disabled and can not be activated A disablement will be signalized as fault on the NANO cont...
Page 11: ...ystem according to the instructions of the supplier 12 4QUARTERLY TESTING COMPETENT PERSON To be conducted by the Competent Person Included as reference for the Premises Management Check all previous...
Page 12: ...itness for a particular purpose It is the responsibility of the premises management to define the fire procedures and ensure that all relevant users are trained and that fire drills are performed with...