5
1.26
5. Installing encased convectors
on unfinished floors
•
Fix the bracket top parts
1
using the hexagonal screws
2
supplied to the bracket feet
3
.
•
Fix the bracket top parts
1
using the hexagonal screws supplied
4
to the support plates
5
at the ends of the heat exchanger.
Units longer than 1600 mm need a further
bracket foot
6
and bracket top part
7
and also support plate
8
•
Fix the bracket top part
7
first of all to the bracket foot using the
hexagonal screw supplied
9
.
•
Fix the bracket to the support plate
8
using the hexagonal screw supplied
bl
.
•
Position the brackets and support
plates on the heat exchanger and push
the support plate between the fins of
the heat exchanger so that the heat
exchanger pipes fit into the recesses in
the support plates.
•
Place the heat exchanger with the
brackets fitted onto the floor where
it is to be installed and mark the drill
holes.
•
Fix the brackets using screws and rawl
plugs (by others)
bm
onto the floor and
level it.
•
Connect up the flow
bn
and return
bo
pipework. The 1/2” valve set type
126102 and the thermostatic valve head
type 110210 from the Kampmann
accessories range can be used. Fit the air
vent
bp
to the flow connection.
•
Fit the casing
bq
with the valve cut-
outs correctly positioned over the
PowerKon convector and rotate the
fixing plates
br
(see detail) underneath the convector.
Diag. 6 Encased convector; casing height 130 mm, casing depth 180 mm
4
4
2
3
3
2
bl
bm
bm
bn
bp
bq
br
bo
1
1
6
7
8
9
5
Detail: Rotating the
fixing plates
Diag. 7 Section through an unfinished
floor unit.
Encased convectors
Encased models with heat exchangers
Installation manual