background image

1.26

1.26

4

1.26

4. Installing encased       

convectors on finished floors

Fix the finished floor brackets

1  

using the hexagonal screws 

2   

supplied to the support plates at both 
ends of the PowerKon heat exchanger

3

.

Units longer than 1600mm need a further
bracket 

with support plate 

5

as a

central bracket:

Fit the brackets using the hexagonal 
screws supplied

6

to the support 

plate. 

Position the brackets and support      
plates on the heat exchanger and push
the support plate between the fins of 
the heat exchanger so that the heat 
exchanger pipes fit into the recesses in 
the support plates. 

Place the heat exchanger with the 
brackets fitted onto the floor where 
it is to be installed and mark the drill 
holes.

Fix the  brackets using screws and 
rawl plugs (by others)

7

onto

the floor and level the unit.

Connect up the flow

8

and 

return 

9

pipework. The 1/2” valve 

set type 126102 and the thermostatic 
valve head type 110210 from 
the Kampmann accessories range can 
be used. Fit the air vent 

bl

to

the flow connection.

Fit the casing

bm

with the valve cut-

outs correctly positioned over the 
PowerKon heat exchanger and rotate 
the fixing plates 

bn

(see detail)        

underneath the convector.

Diag. 4 Encased convector; casing height 130 mm, casing depth180 mm

4

2

3

2

3

bm

bn

1

1

6

7

bl

98

7

5

Detail: rotate fixing
plate

Diag. 5  Section through a finished floor
unit.

Encased convectors

Encased models with                 heat exchangers

Installation manual

Summary of Contents for Powerkon + F

Page 1: ...anual 1 26 1 26 Contents Seite 1 Correct and proper use 2 2 Safety instructions 2 3 Inventory 3 4 Fitting encased convectors on finished floors 4 5 Fitting encased convectors on unfinished floors 5 6...

Page 2: ...o deemed to include adherence to the installation instructions included in this manual The installation of this equipment requires some technical skill and expertise in the field of heating cooling an...

Page 3: ...t exchanger 2 with 1 no air vent 3 supplied loose Brackets the number supplied depends on the length of the casing and the model ordered i e for finished floor 4 or for unfinished floor 5 or wall moun...

Page 4: ...ger with the brackets fitted onto the floor where it is to be installed and mark the drill holes Fix the brackets using screws and rawl plugs by others 7onto the floor and level the unit Connect up th...

Page 5: ...anger pipes fit into the recesses in the support plates Place the heat exchanger with the brackets fitted onto the floor where it is to be installed and mark the drill holes Fix the brackets using scr...

Page 6: ...If there is a central bracket units over 1600mm in length fit it in such a way that the heat exchanger pipes fit into the recesses on the support plate Connect up the flow 8and return 9 pipework The...

Page 7: ...nn valve set type 126102 optional accessory encased convector fitted on a finished floor is illustrated 1 1 2 flow 2 1 2 return 3 air vent 4 1 2 thermostatic valve body on flow 5 thermostatic valve he...

Page 8: ...depth mm Casing height 80 mm Casing height 130 mm 130 180 230 2 1 2 1 2 1 2 1 2 1 2 1 Encased convector shown with finished floor brackets 1 1 2 flow 2 1 2 return Encased convectors Encased models wit...

Reviews: