background image

     

 

 AUTHORIZATION TO MARK

Applicant:

Manufacturer:

Address:

Address:

Country:

Country:

0

2

Standard(s):

Product:

Brand Name:

Models:

Katherm QK may be followed by nano; followed by one to four numbers; followed by 24; followed by three 
numbers; followed by /; followed by three numbers; followed by /; followed by two to five numbers; 
followed by R-Rost, L- Rost; followed by one to three numbers; followed by alu. natur elox, steel, wood or 
brass.

Katherm HK may be followed by 2-Lt., 4-Lt.; followed by 24; followed by three numbers; followed by /; 
followed by three numbers; followed by /; followed by two to five numbers; followed by R-Rost, L- Rost; 
followed by one to three numbers; followed by alu. natur elox, steel, wood or brass.

Baseboard HK.
Baseboard QK. 

This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are 
limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned 
by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is 
restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must 
first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the 
agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect.

Intertek Testing Services NA Inc.

545 East Algonquin Road, Arlington Heights, IL 60005

Telephone 800-345-3851 or 847-439-5667  Fax 312-283-1672

Heating and Cooling Equipment>Valid without technical revision: 01Jan2024< [UL 1995:2015 
Ed.5+R:17Aug2018]

Heating And Cooling Equipment [CSA C22.2#236:2015 Ed.5]
Trench Heating / Cooling convectors

    image only

Control Number:

5017050

Authorized by:  

for L. Matthew Snyder, Certification Manager

This document supersedes all previous Authorizations to Mark for the noted Report Number.

Party Authorized To Apply Mark:

Same as Manufacturer

Report Issuing Office:

Intertek Deutschland GmbH, Kaufbeuren

KAMPMANN GmbH & Co. KG

Kampmann HVAC Sp. z o. o.

Friedrich-Ebert-Str. 128-130
49811 Lingen

ul. Lotnicza 21f
99-100 Łęczyca

Germany

Poland

This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s)
Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing
Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing
Report.

This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be
applied only at the location of the Party Authorized To Apply Mark.

Page 2 of 2   

ATM for Report 2244588KAU-001  

ATM Issued: 10-Mar-2022

ED 16.3.15 (16-Oct-2021) Mandatory

Summary of Contents for Katherm HK

Page 1: ...Nr 1226089 Katherm HK Baseboard 1 43 Baseboard heating and cooling with EC cross flow fan Assembly and Installation Instructions Keep these instructions in a safe place for future use Kampmann de ins...

Page 2: ...2...

Page 3: ...lved in the installation commissioning and use of this product are obliged to pass this manual onto other trades working in parallel or subsequently on this equipment up to and including the end user...

Page 4: ...ng installation If in doubt please contact the manufacturer Any use beyond the aforementioned useshall be deemed to be improper and any damage resulting from this will be the sole responsibility of th...

Page 5: ...ct and proper installation It is imperative that the following safety information is adhered to Disconnect all parts of the system that you are working on from the mains power supply Ensure that the e...

Page 6: ...convectors Installation instructions 3 Assembly and waterside connections l Remove outer film and packaging cardboard Fig Katherm HK Baseboard in correct assembly position Place the Katherm HK Baseboa...

Page 7: ...ipework l Perform a pressure test l Mount the casing back on the mounting frame in reversed order l Ensure that this manual is clearly visible to subsequent trades on this equipment Fig Demounting of...

Page 8: ...an convection with compact EC motor Ready to install baseboard convectors Installation instructions 4 Water connections Katherm HK Baseboard Design Katherm QK Baseboard 1Flow 2Return Room side pipe co...

Page 9: ...stallation and operating manual as well as all applicable regulations Regular servicing and maintenance is needed to ensure the correct operation and performance of Katherm HK Baseboard units Fans l C...

Page 10: ...Condensate drip tray l Remove the drain hose from the condensate drip tray Fig Pulling out the condensate drip tray Carefully pull out the condensate drip tray Fig Tilting of the condensate drip tray...

Page 11: ...1 43 Ready to install baseboard convectors Installation instructions Fig Snap joint connection of the condensate drip tray Reinsert the condensate drip tray in reversed order When reinserting the cond...

Page 12: ...tor Ready to install baseboard convectors Installation instructions 6 Electrical connection electromechanical controls 6 1 Wire electrical connections Fig Katherm HK Baseboard with terminal strip Conn...

Page 13: ...LRQ 7 SH 2ULJLQ 7HO D 0DLO LQIR NDPSPDQQ GH QWHUQHW ZZZ NDPSPDQQ GH 0 7 QXPEHU DWKHUP DVHERDUG YHUVLRQ 9 ZLWK WHUPLQDO VWULS FRQWURO 9 YLD 06 V VWHP YDOYHV E RWKHUV DVNH 7 HFNPDQQ 0 EORZHU XQLW 530 PD...

Page 14: ...Equipment CSA C22 2 236 2015 Ed 5 Trench Heating Cooling convectors Katherm QK may be followed by nano followed by one to four numbers followed by 24 followed by three numbers followed by followed by...

Page 15: ...must first be approved in writing by Intertek Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agr...

Page 16: ...ert Str 128 130 49811 Lingen Ems Germany T 49 591 7108 0 F 49 591 7108 300 E info kampmann de Kampmann UK Ltd Dial House Govett Avenue Shepperton Middlesex TW17 8AG Great Britain T 44 0 1932 228592 F...

Reviews: