7
Ka
therm
HK Baseboard -
Cross-flow fan convection with compact EC motor
1.43
Ready-to-install baseboard convectors
Installation instructions
l
Then fit the flow and return pipework.
l
Perform a pressure test.
l
Mount the casing back on the mounting frame in reversed order.
l
Ensure that this manual is clearly visible to subsequent trades on
this equipment.
Fig. Demounting of the casing
• Pull the casing towards you and lift it carefully.
Fig. Fastening points of the mounting frame.
• Fix the mounting frame to the floor on the left and right hand side.
Summary of Contents for Katherm HK
Page 2: ...2...