INSTALLATION INSTRUCTIONS
Vanity
1207801-2-
B
© 2013 KALLISTA
Questions? Problems? For additional assistance, please contact KALLISTA’s Customer
Service Department at 1-888-4-KALLISTA (1-888-452-5547) or kallista.com.
4 of 8
2. STONe TOP hOLe FABRICATION
Partially Drilled Hole
Top or Finished Surface
Underside
2"
(51 mm)
4"
(102 mm)
4"
(102 mm)
6-5/16"
(160 mm)
Top or
Finished Surface
File
NOTe:
Three faucet holes have been partially drilled from the underside of the stone top.
Determine the number of faucet holes needed for your installation.
Turn the stone top upright.
On the top or finished surface of the stone, locate the center for each faucet hole that will be used.
NOTe:
The circles should align with the partially drilled holes on the underside of the stone top.
Use a compass or circle template to draw a circle representing the holes.
IMPORTANT!
Striking the stone with too much force or from the underside will damage the top or finished
surface of the stone.
Using a small hammer, create the faucet hole(s) by gently tapping the stone within the circles until the
stone breaks away.
Using a file or sanding cylinder, complete the removal of stone material to create a clean, round hole.