background image

INSTALLATION INSTRUCTIONS

  Two-Handle Wall-Mount Bath Valve

1085232-2-

A

© 2013 KALLISTA

4 of 4

Questions? Problems? For additional assistance, please contact KALLISTA’s Customer

Service Department at 1-888-4-KALLISTA (1-888-452-5547) or FAX 1-888-272-3094.

2.  INSTALL The YOke

Backer Board 

(Not Supplied)

Temporary Nipple

Bath Ell

1/2" Supply Pipe

Nut

1/2" Threaded 

Pipe Union

4" (102 mm) 

Typical

4" (102 mm) 

Typical

Yoke

Cold

Hot

NOTe:

 Typical dimensions are shown on the roughing-in diagram.

NOTe:

 Refer to the trim installations for specific requirements.

NOTe:

 Refer to the handle installation instructions for possible roughing-in depth requirements.

NOTe:

 The faucet fitting is factory assembled for hot and cold water.

 

‰

Unless otherwise instructed, rough-in the supply yoke 3" (76 mm) minimum to 4" (102 mm) maximum from 

the center of the supply inlets to the outside of the finished wall.

 

‰

Install 1/2" hot and cold supply pipes.

 

‰

Slide the nuts over the supply pipes and then thread the 1/2" threaded pipe unions onto the ends of the 

supply pipes.

 

‰

Thread the nuts onto the yoke.

 

‰

Install the pipes and adapters between the yoke and bath ell.

 

‰

Secure the yoke, supply pipes, and bath ell to the backer boards.

 

‰

Install a temporary 1/2" nipple into the bath ell.

Reviews: