
INSTALLATION INSTRUCTIONS
Two-Handle Wall-Mount Bath Valve
1085232-2-
A
© 2013 KALLISTA
3 of 4
Questions? Problems? For additional assistance, please contact KALLISTA’s Customer
Service Department at 1-888-4-KALLISTA (1-888-452-5547) or FAX 1-888-272-3094.
ROUghINg-IN INFORMATION
Top of Bath Rim
2-3/16"
(56 mm)
Finished Wall
Ø 1-5/8"
(41 mm)
Hole
4" (102 mm)
4" (102 mm)
3" (76 mm)
Min
4" (102 mm)
Max
1/2" NPT
1/2" NPT
1/2" NPT
1/2" NPT
4" (102 mm)
Typical
4" (102 mm)
Typical
1. PRePARe The YOke
Valves
Cold
Ceiling Supplies
Plug
Hot
Yoke
Plug
For Ceiling Supplied Installations
Turn the yoke over to allow the supplies to connect from the top of the yoke.
NOTe:
Reversing the yoke for ceiling supplies will reverse the direction in which lever handles close.
For proper lever handle operation, remove and reverse the ceramic valves.
Make sure the valves are not dirty or damaged.
Wrench tighten the valves.
For All Installations
Install a 1/2" NPT plug in the appropriate hole in the center of the yoke.