Step 18 - Hinges Covers Installation
Install the two hinges covers on the mobile panel. The largest side
must be toward the wall jamb (fig.18).
Note : Check the label on the back of each cover to know
which one goes at the top hinge and which one goes at the
bottom hinge.
Etape 18 - Installation des
couvercles de penture
Installer les deux couvercles de penture sur le panneau mobile.
Le côté le plus large se place vers le montant mural (fig. 18).
Note : Regarder l’étiquette à l’arrière de chaque couvercle
afin de savoir lequel va sur la penture du haut et lequel va sur
la penture du bas.
Step 19 - Caulking
Apply a bead of caulking between the shower base and the
sill
, then between the base and
fixed panels
and along of the
jambs
(fig. 19).
IMPORTANT: Apply caulking on the exterior of the
shower only to avoid any water leak
.
Wait 24 hours before using the shower
.
Your installation is now complete!
Etape 19 - Application du calfeutrant
Appliquer un joint de calfeutrant entre la base et le
seuil
,
puis entre la base et les
deux panneaux fixes
et le long des
montants
(fig. 19).
IMPORTANT
:
Appliquer le calfeutrant à l’extérieur de la
douche seulement pour éviter toute fuite d’eau
.
Attendre 24 heures avant d’utiliser la douche
.
Votre installation est maintenant complétée!
Fig. 19
heures
hours
24
Calfeutrant
Caulking
50mm (2”)
Calfeutrant
Caulking
Calfeutrant
Caulking
Calfeutrant
Caulking