transportation and handling. If the machine appears to have been damaged, contact
us immediately. Fit all the supplied accessories onto the machine such as the bar
stop and the roller arm.
7.2 FASTENING OF THE MACHINE
The machine will be able to operate in keeping with the technical parameters
supplied by us, if it is positioned correctly and fastened securely to the bench
or the factory floor so that vibrations are minimal during operation. Consult
drawing machine Installation plan Encl.
7.3 BAND ASSEMBLY
Remove the bow guard by unscrewing the screws and the hand wheels. Fit the band by
inserting it first between the bearings of the blade guide heads and then on the two
pulleys, tighten the blade slightly by means of the hand wheel and replace the bow guard.
Check that the band is fitted with the correct direction of teeth, as shown in drawing
enclosed document. Make sure that the band type (dimensions 2825×25.4×0.9 mm) and
its teeth pith are suited to the material to be cut.
7.4 ELECTRICAL CONNECTION TO THE MAINS
Install a differential thermo magnetic switch with characteristics suited to the mains.
Make sure that the power supply voltage corresponds to the voltage on the motor plate.
Connect the cable to the power supply line observing the color codes of the individual
wires, pay particular attention to the earth wire. Connect the machine, make sure that the
rotation of the circular blade is in the direction shown by the arrow on the guard.
7.5 CUTTING COOLANT
For the cooling of the circular blade
,
fill the tank with emulsible oil obtained from a
mixture of water and AGIP ULEX 260 EP oil with a percentage of
?
-
?
%
8. MACHINE START UP AND OPERATION
8.1 DEVICES AND THEIR LOCATION
(The location of the devices described is shown on the installation plan Encl.)
Code
CHANGE OVER SWITCH
Summary of Contents for BS-126G
Page 1: ...METAL CUTTING BAND SAW MODEL BS 126G Assembly Operating Instruction...
Page 17: ......
Page 18: ......
Page 19: ......