  Check the 

condition of the ground surface

, if applicable, follow the instructions for the in-

spection and maintenance of shock-absorbing floors specified by the manufacturer / distribu-

tor of playground floors, especially with regard to the level of loose fill material. 

  Check the 

ground clearance

 of the swing platforms / seats. 

2.2. 

every 3 months

 (or different, determined by local factors)

  

 

Check axles, hubs and bearings

 for smooth running, bearing shake, wear or corrosion. 

 

Check for bearing play

 and wear. To check, the swing platform and the universal joint must 

be relieved by lifting the platform (e.g. by 2nd person or trestles). The swivel housing is man-

ually set in motion to all directions. If wearout in excess of the intended swivel and rotary 

movements is detected damage requiring repair is present. 

2.3. 

every 6 months

 (or different, determined by local factors)

  

  Check 

components 

for tight fit; check screw connections and tighten if necessary. The in-

structions given in the regular maintenance work, e.g. regarding torques, must be observed. 

 

Replace lubrication

 as described in appendix 

"A2 Replace lubrication at least every 6 

months"

3.  Annual main inspection 

  Check 

playground equipment

 including all components and construction elements above and 

below the playing level for damage caused by wear, vandalism, weather events, rotting, corrosion 

and element formation, etc. This may require excavation or access to areas below the playground 

level and subsequent repair of the playground surfacing. 

  Check 

foundations 

for damage due to wear, vandalism, weather events, rotting, corrosive and 

element formation, etc. This may require excavation or access to areas below the playing level 

and subsequent repair of the playground surfacing. 

  Inspect the 

playground surfacing 

using the inspection procedures and maintenance instructions 

provided by the manufacturer/distributor of playground floors, particularly with regard to levels of 

loose fill material. 

4.  Endurance of the rotating swivel 

Dismount the 

swing joint 

of the playground equipment at the latest after a service life of 10 years 

and send it to the manufacturer/distributor for revision. It is assumed that the playground equipment 

is installed on a normally frequented playground in a normal environment. If the previous operational 

inspections have shown that local factors exist that deviate from normal, the life span must be ad-

justed. This can lead to a shortening of the service life specified by the manufacturer/distributor. An 

extension of the life span is excluded as this is the maximum duration. 
If 

damage is found to the swing joints

, the affected play equipment must be take out of service 

and must be closed until overhauled by the manufacturer/distributor or the swing joint is replaced. 

Access to the public, including children, must be prevented. 
 
 
 
 
 
 
 

 

Summary of Contents for 040710004

Page 1: ...e Freizeitgeräte GmbH 2019 09 10 Im Südloh 5 D27324 Eystrup Telefon 0 42 54 93 15 0 Fax 0 42 54 93 15 24 E Mail info kaiser kuehne play com M A I N T E N A N C E I N S T R U C T I O N S Single point swing Item 040710004 Page 1 of 10 Single point swing Item 040710004 ...

Page 2: ...ks such as welding can only be performed by qualified professionals or require machining by the manufacturer dis tributor o The owner operator of the playground should set up a suitable inspection plan for the play ground and document the inspections and maintenance performed there for the particular play ground equipment One time maintenance work Four weeks after installation all screw connection...

Page 3: ...ion Check playground equipment including all components and construction elements above and below the playing level for damage caused by wear vandalism weather events rotting corrosion and element formation etc This may require excavation or access to areas below the playground level and subsequent repair of the playground surfacing Check foundations for damage due to wear vandalism weather events...

Page 4: ...ing Item 040710004 Page 4 of 10 Annexion A1 Visual inspection of swivel at least once a month Check for visibility of the red coloured warning groove Dismount the swing joint of the playground equipment at the latest after a service life of 10 years and send it to the manufacturer distributor for revision Warning groove red coloured NOT VISIBLE Lock the play equipment imme diately send the swing j...

Page 5: ...lubrication at least every 6 months Procedure Lube point 1 1 Remove the screw plug 1 with an Allen key size 5 mm do not lose the sealing ring 2 Press lubricant into the grease nipple using a lever grease press until fresh lubricant emerges from bore 1 3 Pick up escaping old lubricant with e g cleaning rags and dispose of it properly 4 Insert screw plug 1 and tighten firm ly Lube point 2 5 Remove t...

Page 6: ...40710004 Page 6 of 10 Annexion E1 Spare parts Item Qty Title Illustration 1060841 1 Single point swing assembled steel beam L approx 5 42 m W approx 0 60 m H approx 0 18 m Weight approx 253 kg 1060147 1 Steel beam without swing joint and rubber bump 1060829 1 Universal joint with swivel four chain strands 3400477 4 Hexagonal srew M16x45 DIN 933 galvanized for installation of universal joint 106082...

Page 7: ... I O N S Single point swing Item 040710004 Page 7 of 10 3430018 8 Hexagon cap nut M16 for installation of universal joint 1060829 1060693 4 U Link of universal joint 2030204 4 Dog point screw M16x25 stainless steel 1060713 1 Single point platform swing chains included L approx 1 40 m W approx 1 40 m H approx 0 25 m Weight approx 40 kg 3590050 1 Single point swing seat 1060742 4 U Link 6 mm plastic...

Page 8: ...30010 8 Hexagon cap nut M8 DIN 986 A2 for U Link 6 mm 1060742 015753 stainless steel chain 1 4310 nominal size Ø 7 0 mm material sold by meter 1060180 1 Rubber bump stop for K K Single point swing steel beam incl steel sheet 3400290 2 Hexagon screw M16x 60 DIN 933 zinc for installation of rubber bump 1060180 3430019 2 Washer Ø 17mm DIN 125 for installation of rubber bump 1060180 1060148 1 Ground f...

Page 9: ... of 10 3400381 4 Hexagon screw M20 x 35 DIN 933 for installation of ground fixing 1060148 3430027 4 Washer Ø 21 DIN 125 for installation of ground fixing 1060148 1060033 2 support for K K Single point swing L approx 2 71 m W approx 0 24 m H approx 0 20 m Weight approx 54 kg 3400318 4 Hexagon screw M16 x 230 DIN 931 zinc for installation of support 1060033 3430018 4 hexagon cap nut M16 for installa...

Page 10: ...o kaiser kuehne play com M A I N T E N A N C E I N S T R U C T I O N S Single point swing Item 040710004 Page 10 of 10 3300010 8 Cap grey SKS 16 for installation of support 1060033 5200733 1 Fluid grease cartridge 400 g for K K swing joints 5200732 1 Lever grease press e g for K K swing joint SFWZ0000014 1 Lubricating metal bag 4g as assembly grease for stainless steel fasteners ...

Reviews: