Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the open position.
2. Connect the charge set to the 3-way valve’s service port.
Leave the valve on the charge set closed.
Connect the charge hose with the push pin to the service port.
3. Open the valves (Low side) on the charge set and discharge the refrigerant until the gauge indicates
0.05 to 0.1Mpa.
If the pressure when the air conditioner is not running is higher than 0.1Mpa, discharge the
refrigerant until the gauge indicates 0.05 to 0.1 Mpa. Discharge the refrigeration gradually; if it is
discharged too suddenly, the refrigeration oil will be discharged.
6.8 Evacuation
Procedure:
1. Connect the vacuum pump to the charge set’s centre hose.
2. Evacuation for approximately one hour.
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
3. Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
Summary of Contents for R ON-OFF series
Page 1: ...SPLIT WALL MOUNTED TYPE R ON OFF SERIES...
Page 8: ...6 2 Function...
Page 11: ...9 3 Dimension 3 1 Indoor Units Figure 1 Figure 2...
Page 14: ...12 4 Refrigerant Cycle Diagram For heat pump models...
Page 15: ...13 5 Wiring Diagram 5 1 Indoor Units KSR1 07HRN1 QC2 A KSR1 09HRN1 QC2 A KSR1 18HRN1 QB8...
Page 16: ...14 KSR1 21HRN1 QB8W KSR1 21CR QB6W KSR1 21HR QB6W KSR1 24HRN1 QB8W...
Page 17: ...15 5 2 Outdoor Units KOK1 07HN1 QC2 KOA1 09HN1 QC2...
Page 18: ...16 KOE 18HN1 QB8...
Page 19: ...17 KOF 21HN1 QB8W K0F2 21C QB6W KOP 21H QB6W...
Page 20: ...18 KOF2 24HN1 QB8W...