95
English
INSTALLER
MAINTENANCE
The following maintenance interventions must only
be carried out by the installer or by qualified per-
sonnel:
• Inspect the filters and clean them if necessary;
• Inspect the heat exchanger and clean it if necessary;
• Inspect the fans and clean them if necessary;
• Check the condensate drain once every two years.
The following paragraph have a short description of
the maintenance interventions.
PLEASE NOTE: If maintenance is not carried out
regularly, the ventilation system might not work
properly.
• Check the heat exchanger
Check the heat exchanger once every two years.
Always disconnect power before accessing
the unit.
• Open the front panel
1
2
• Unscrew the front panel and remove it.
1
2
Summary of Contents for KVX-270 RHQ
Page 2: ......
Page 3: ...INSTRUKCJAOBS UGI OWNER SMANUAL BEDIENUNGSANLEITUNG 5 55 123 PL EN DE...
Page 4: ......
Page 23: ...23 Polski Instalacja sterownika na cianie 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56...
Page 53: ......
Page 54: ......
Page 71: ...71 English Installing controller on the wall 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56...
Page 101: ...101 English...
Page 102: ......
Page 117: ...16 Deutsch 1 2 3 4 Installation der Wandbedieneinheit 1 2 3 4 60 9 10 8 10 9 57 56 Deutsch 117...
Page 146: ......
Page 147: ......
Page 148: ...kaisai com...