9
Configuration and operation
9.1
Initial start-up
NOTE
The DC power supply must be guaranteed during initial start-up.
8
The sequence of the settings required for initial start-up is preset in the configuration assistant.
Following successful authorisation and selection of the main menu option - Configuration , the installation wizard is
opened directly (if the device is still on the factory defaults and commissioning has not yet been carried out).
The installation wizard can still be relaunched at a later stage to make further changes to the original configuration.
The installation consists of several steps, which are listed below.
Step: Language selection
↻
The installation wizard has been started or re-started.
1. Select
Menu language
via the dropdown menu.
2. Confirm the action field.
ð
The
Forward
button jumps to the next installation step.
Fig. 42:
Menu item: [See sec-
Step: Country configuration
↻
A language has been selected.
1. Select
Country
and
Grid type
from the dropdown menu.
2. Confirm the action field.
ð
The
Forward
button jumps to the next installation step.
Fig. 43:
Step: Network parameters
↻
The country and grid type have been selected.
.
NOTE: By default, IP addresses are assigned via the plant DHCP
server.
.
NOTE: If static IP addresses are required, you will have to assign
these.
.
CAUTION! In this case, it is no longer possible to distribute the con-
figuration via the Segment Controller as this would then be part of
the configuration and ultimately all inverters in the same segment
would be assigned the same IP address.
1. Activate
DHCP
or enter the
IP address
at the deactivated DHCP.
2. Confirm the action field.
ð
The
Forward
button jumps to the next installation step.
Fig. 44:
Menu item: [See sec-
8
It is only possible to configure the grid parameters with DC voltage. The further parameters can also be con-
figured with a present AC voltage.
Manual
Configuration and operation | 9
KACO blueplanet 100 TL3
Page 39