
Maintenance
9 --- 42
9.11
Topping off the oil
The oil level indicator (9) of machines in operation should be checked weekly. The machine
should be topped off with oil as soon as the minimum level (1) (border of green and red) is
reached.
The machine may only be operated when the oil level indicator is in the
green zone.
lo
w
hi
g
h
lo
w
hi
g
h
lo
w
hi
g
h
1
2
3
1 Lowest oil level
2 Optimum oil level
3 Highest oil level
Remove cover panel (3, siee chapter 9.2).
Check the oil level when the compressor is running.
Stop the compressor package under full load (see chapter 8.4).
Lock the main disconnect in the ”off” position in accordance with ap-
plicable lock out/tag out procedures (example: OSHA CFR 29
§ 1910.147) to ensure the compressor does not restart.
Before opening or removing pressurized components (pipes, hoses,
tanks, etc.) it is imperative that the compressor package is completely
depressurized.
Venting the compressor package (see chapter 9.9).
Attention!
Summary of Contents for CSD 75
Page 2: ......
Page 11: ...Technical Specification 1 6...
Page 19: ...Construction and Operation 5 14...
Page 20: ...Construction and Operation 5 15...
Page 58: ...Appendix 11 53 11 Appendix 11 1 Wiring Diagram...
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......