5
4
!
Apply appropriate sealant to top and each side edge of mount, covering exposed butyl. No need to
apply to the bottom of mount. If the mount falls on top of a shingle seam, fill and seal the seam with a
compatible roof sealant. If a seam comes within 2" of the lag screw, fill the seam with roof sealant.
Sealant application
5a
!
Position and install rail on back side of Splice Foot towards the ridge, as shown in the image. Insert only one
T-Bolt through one Splice Foot slot and into side channel of CrossRail. Turn the T-Bolt clockwise ensuring that
the mark at the end of the shaft is vertical, indicating proper alignment. Tighten to 25.8 ft-lbs (35 Nm).
Attaching single CrossRail