RWZ1bA11.sch
SHEVS Control Centre RWZ 1b
RWZ 1
2
2x0.8
RM 2 / TM 2
RM 3 / TM 3
3x1.5
L/N/PE
L/N/PE
3x1.5
4x0.8
Option WRM
WM / RS
Page A-9
or
WM / RS
Option PK
Page A-7
RWZ1bA12.sch
Ver. 1/14 Mo
17 Mar. 2014
2x0.8
2x0.8
2
3x0.8
10x0.8
6x0.8
3x0.8
RT 2-*-BS-AA-A
RT 2-*-BS
RT 2-*
3x0.8
LT
LT
1)
1)
j
j
2)
2)
2)
j
j
j
3)
2)
3)
3)
j
j
j
j
1
A -
9
/
or
3x1.5 (230 V~) / 3x0.8 (30 V-)
SHEVS Control
Example of connection on page A-2, detailed examples on following pages.
FACP
F
WRC
r
PFC
s
PFC
System diagram
(please consider local conditions / components)
r
Smoke Exhaust
r
o
s
Smoke Exhaust
r
o
s
A
S
Smoke Exhaust
Run the actuator lead unbranched
to under the roof.
For max. allowed lengths of cable,
please refer to section "Technical Data".
Max. 10 mm² (rigid) can be clamped.
Page A-7
Page A-4
General: length of cable max. 400 m, if not specified otherwise.
2x0.8 for WRC
4x0.8 for option WRM
Page A-8
Mains
Page A-3
Wind- and Rain Control (WRC)
4x0.8 for LT-A
Pages A-5 and A-6
Number of wires depends
on type and order of
connection of the manual
call points.
See also