10
4 - INSTALLATION
For ease of installation, use the following guide:
4.1 - Mounting the support bracket.
4.2 - Mounting the hood unit.
4.3 - Electrical connection and functional check.
4.4 - Exhaust and filter connection.
4.5 - Mounting the telescopic chimney stack.
4.1 - Mounting the support bracket. Backing.
Refer to (figs. 2a-b):
1 -
On the wall draw a vertical line to the ceiling, in the centre of the area where the hood is to be
mounted. This enables vertical alignment of the various parts.
2 -
Position the bracket
I
a) Place the bracket
I
on the wall, aligning its centre (notches) on the vertical line at a distance
between the axis of its holes and the cooking surface:
1 - with backing: d = 300 +
H
mm, where
H
= height in mm of the visible part of the
backing. Due to the various types of backings available, this measurement must be taken
directly on the backing provided.
2 - without backing: d = at least 950 mm.
N.B. - Check that the bracket I is in a horizontal position. Minor adjustments can be made
using the hood regulating screws (see below).
b) Mark the centres of the two eyelet holes of the bracket on the wall.
3 - Using an 8 Ø mm bit, drill the marked centres, then fix firmly the bracket
I
using the 8 Ø
mm rawl plugs and screws provided.
4 - Backing (optional)
In this manner the distance of the cooker hood from the cooking surface is determined by the
height of the backing
B
and by the height of the bases. The backing is to be mounted before
mounting the hood unit and, if you wish to fix both upper and lower parts to the wall, it must
be mounted at the exact height before mounting the bases or the relative upper surface. Since
this operation is complex, it must be performed only by the kitchen installer or by competent
persons who know all the final measurements of the kitchen units. For upper fixing only,
proceed as follows:
a) Place the backing on the base surface as in fig. 2a. Set it against the wall and centre it with
respect to the base.
b) On the wall, mark the centres of the two holes of the upper flaps.
c) Using an 8 Ø mm bit, drill the holes in the wall and fix the backing using the 8 Ø mm rawl
plugs and screws provided.
d) If it is necessary to block the lower part, this must be done by the installer.
4.2 - Mounting the hood unit (fig. 3)
1 - Turn the two screws
V
(placed where the hood will be hooked) about halfway in.
2 - Hook the back part of the hood to the support bracket
I
fixed to the wall.
3 - Turn the screws
V
for vertical adjustment of the hood and level it horizontally.
4 - Insert and tighten the central fixing screw
V1
(supplied) for final blocking.
Part 1 - INSTALLATION INSTRUCTIONS
Summary of Contents for JDK7090G
Page 9: ...31 1 2 ...
Page 10: ...32 3 4 5 6 ...
Page 11: ...33 7 8 9 10 11 12 ...
Page 12: ...34 V3 V2 V1 L 13 14 15 16 17 ...
Page 13: ...35 ...