Specification
6 720 645 817
(2010/09)
28
2.3.2
Factory-prepared cascade MKB ...
Fig. 13 Installed dimensions Suprapur factory-prepared 2-boiler cascade (dim. in mm)
Minimum handling details
Unit
MKB 240-3 A
MKB 320-3 A
MKB 400-3 A
MKB 480-3 A
MKB 560-3 A
A
mm
700/500
700/500
700/500
700/500
700/500
B
mm
–/900
–/850
–/1000
–/940
–/890
C
1)
1) If the cascade pipework is installed in a different direction, then C = A
mm
–/1320
–/1370
–/1370
–/1420
–/1420
S
mm
–/419
–/367
–/515
–/454
–/407
Tab. 16 Recommended/minimum installed dimensions Suprapur – factory-prepared 2-boiler cascade
A
B
≥ 100
S
C
800
A
6 720 644 748-09.1O
Installation example: The pipework for flue
gas and heating water can be turned 180°.
Unit
MKB 240-3 A
MKB 320-3 A
MKB 400-3 A
MKB 480-3 A
MKB 560-3 A
Minimum depth
mm
612
612
612
612
612
Minimum width
mm
855
1065
1065
1275
1275
Minimum height
mm
1405
1405
1405
1405
1405
Minimum weight
kg
190
219
244
277
307
Tab. 17 Minimum handling details Suprapur factory-prepared 2-boiler cascade