MX10016 Site Preparation Overview
IN THIS SECTION
Site Preparation Checklist | 89
Environmental Requirements and Specifications | 90
Site Electrical Wiring Guidelines | 92
MX10016 Rack Requirements | 93
Clearance Requirements for Airflow and Hardware Maintenance for an MX10016 | 95
Site Preparation Checklist
The checklist in
summarizes the tasks you need to perform when preparing a site for
an MX10016 installation.
Table 27: Site Preparation Checklist
Date
Performed By
For More Information
Item or Task
Environment
and Specifications” on page 90
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distance between external
power sources and the router installation site.
Calculate the power consumption and
requirements.
Rack
Verify that your rack meets the minimum
requirements for the installing the router.
89
Summary of Contents for MX10016
Page 1: ...MX10016 Universal Routing Platform Hardware Guide Published 2019 10 15 ...
Page 19: ......
Page 86: ......
Page 123: ......
Page 153: ......
Page 239: ...Figure 118 Moving the MX10016 Using a Mechanical Lift g100421 242 ...
Page 240: ...5 CHAPTER Troubleshooting Hardware Restoring Junos OS 245 Alarm Messages 249 ...
Page 241: ......
Page 249: ......
Page 277: ...Restricted Access Warning 281 ...
Page 292: ...Jewelry Removal Warning 296 ...
Page 295: ...Operating Temperature Warning 299 ...
Page 304: ...DC Power Disconnection Warning 308 ...
Page 308: ...DC Power Wiring Sequence Warning 312 ...
Page 311: ...DC Power Wiring Terminations Warning 315 ...
Page 320: ...Translation The emitted sound pressure is below 92 dB A per GR63 CORE 324 ...