Table 22: Site Preparation Checklist
(Continued)
Item or Task
For More Information
Performed by
Date
Plan rack or cabinet location, ensuring the
required space clearances.
"Clearance Requirements for
Airflow and Hardware
Maintenance for an EX9253
Switch" on page 53
Secure the rack or cabinet to the floor
and building structure.
"Rack and Cabinet Requirements
for EX9253 Switches" on page
54
Cables
Plan the cable routing and management.
Acquire cables and connectors:
•
Determine the number of cables
needed based on your planned
configuration.
•
Ensure that the distance between
hardware components to be
connected allows for cable lengths to
be within the specified maximum
limits.