4.2
Operation
4.2.1
Commissioning unfilled batteries
Z
The operations required must be carried out by the manufacturer's customer service
department or a customer service organisation authorised by the manufacturer.
4.2.2
Commissioning filled and charged batteries
Battery cell cross section
Top view of a battery cell
122
123
124
122
123
124
Checks and operations to be performed before starting daily work
Procedure
• Make sure the battery is in physically good condition.
• Make sure the terminals are correct (positive to positive and negative to negative)
and check that contacts on the battery terminal conducting system are secure.
• Check the M10 terminal screws of the conductors and connectors are secure and
if necessary torque to 23 ±1 Nm.
• Charge the battery, see page 216.
• Check the electrolyte level of each battery cell after charging and top up if
necessary:
• Open the plug (122).
Z
The electrolyte level should not be less than the "Min" electrolyte marking (123)
and must not exceed the "Max" (124) marking.
• If necessary, add electrolyte with pure water up to the "Max" electrolyte level
marking (124), see page 218.
• Close the plug (122).
The test is now complete.
215
04.19 en-GB
Summary of Contents for EJE 220
Page 2: ...2...
Page 4: ...4 04 19 en GB...
Page 22: ...4 2 Dimensions D 22 04 19 en GB...
Page 34: ...34 04 19 en GB...
Page 59: ...2 Displays and Controls 6 5 53 7 12 6 52 50 10 8 13 54 55 14 56 51 49 59 04 19 en GB...
Page 61: ...6 5 53 7 12 6 52 50 10 8 13 54 55 14 56 51 49 61 04 19 en GB...
Page 63: ...6 5 53 7 12 6 52 50 10 8 13 54 55 14 56 51 49 63 04 19 en GB...
Page 64: ...64 04 19 en GB...
Page 91: ...91 04 19 en GB...
Page 92: ...92 04 19 en GB...
Page 96: ...96 04 19 en GB...
Page 144: ...144 04 19 en GB...
Page 170: ...170 04 19 en GB...