Operation

The compli sewage lifting station operates fully automatically.

The integrated level controller switches the pump on and off 

depending  on  the  water  level  in  the  tank.  A  test  run  of  the 

pump  can  be  started  using  the  rocker  switch  at  the  plug.  A 

green LED lights up when the unit is ready for operation.

Shutting down the unit

Pull the mains plug out of the socket. If it is not possible or not 

permitted to interrupt the inflow in the case of mains failure, an 

emergency back-up generator must be provided. 

The installation of a diaphragm hand pump is recommended 

for emptying the tank in the case of mains failure or pump mal

-

function.  

Inspection

To ensure operational reliability, a test run must be carried out 

once a month. The pipe connections must be checked for leaks 

at the same time. 

Servicing

We  recommend  that  servicing  be  carried  out  in  accordance 

with EN 12056-4 and EN 60074-19.

Before carrying out any work, pull out the mains plug 

and ensure that the power supply to the unit cannot 

be switched on again by anyone else.

Check the plug and the rubber hose for signs of me

-

chanical  and  chemical  damage.  Damaged  or  kinked 

pipes or hose must be replaced.

Servicing and maintenance of the sewage lifting stati

-

on must be carried out at intervals of 6 months, by a 

qualified technician.  

In accordance with DIN EN 12056-4, we recommend that the 

following works be included in the service:

1. 

Check the connection points for watertightness and inspect 

the areas surrounding the unit and the fittings.

2. 

Operate the shut-off valves and check that they move easily. 

Adjust and grease them if necessary.

3. 

Clean the pump and the pipes where they connect to the 

unit; check the impeller and the bearings.

4. 

Clean the inside of the tank (as necessary, or if especially re

-

quired); remove any grease, for example.

5. 

Check the condition of the collecting tank.

6.  Flush the system through with water once every 2 years.

7.  When all the servicing tasks have been performed, carry out 

a test run and then put the unit back into operation.

The service must be documented, giving details of the impor

-

tant data and of all the tasks carried out.

Quick tips for remedying faults

If the unit does not work:

•   Check the mains voltage, the fuse and the ground fault cir

-

cuit interrupter.

•   If the mains cable is damaged, it may be repaired only by the 

manufacturer.

•   If the float switch is obstructed, close the inlet shut-off valve, 

open the maintenance cover and clear the blockage.  

If the alarm is triggered and the unit does not work:

•   The  thermostat  in  the  motor  windings  may  have  switched 

off the system because the pump is obstructed. In this case, 

close the shut-off valve at the inlet, pull out the mains plug, 

remove the pump module, and clear the blockage.

If the pump performance decreases:

•   Check  that  the  shut-off  valve  in  the  pressure  pipe  is  fully 

open.

•   If the pressure pipe is blocked, flush water through the pres

-

sure pipe to clear it.

•   If the non-return valve is blocked, empty the pressure pipe 

and clean the non-return valve.

•   If the ventilation system is blocked, clean the ventilation hose 

that leads from the pump tank and check the drilled holes.

Technical data

m

[kg]

29

DN

80

[mm]

50

P1

[kW]

1.25

P2

[kW]

0.94

U

[V]

1/N/PE ~230

f

[Hz]

50

I

[A]

6.0

Performance

[m]

1

2

3

4

5

6

7

Q

 [m³/h]

29

28

25

22

20

17

14