17
Continue to attach springs in the same sequence as above: in the middle of of each section, making sure the
next spring is attached on the opposite side to even out the tension.
Important: The stitcched bed is designed like elastic to be bouncy, which means that during construction it may
look like it won’t fit. Please note that it will stretch to the correct size when attaching the springs, this may take
some force.
The stitched bed is now filled and you have completed jumping mat.
Important: Attach the springs in
the order shown in the diagram.
This will help to distribute the
tension, making assembly easier.
Firstly, locate the 2 colored V-rings.
These V-rings are to be attached
at points 1 and 2 using a silver
spring.
Then attach silver springs 3 to 18
in the order shown in the diagram.
These are all silver top springs.
Important: Remember to include
the ‘under spring’ holes when
counting the V-rings on the frame
and bed.
Once all of the springs shown in
remaining top springs can be
attached, including the gold
springs.
This diagram shows the initial order of spring attachment.
= Top spring hole
,
= Bottom spring hole
A
A
A
C
C
E
E
D
D
B
B
A
Summary of Contents for JKOV914SL1
Page 2: ...2...
Page 3: ...3 9ft x 14ft Oval Combo 3 3...
Page 7: ...1 877 927 8777...
Page 8: ...8 21 21...
Page 9: ......
Page 10: ......
Page 11: ...the sharply spot...
Page 12: ......
Page 13: ......
Page 14: ......