15
1. Separate all the parts by markings as shown:
Qty 6 - Key #1 toprails with T-connector
Qty 6 - Key #2 toprails with T-connector with Welded tube
Qty 12 - Leg extensions
Qty 6 - 'W' shaped legs
1.1 Start assembling the 6 sections by :
Connecting toprail Key #1 to toprail Key #2.
Once complete, there will be a total of 6 sections as shown in the diagram.
1.2 Once you have all 6 toprail sections assembled and laid out in rows:
Start by connecting the leg extension into the T-connector.
Finish by connecting the 'W' shape leg into the leg extensions.
Repeat the steps above for the remaining sections.
Please note: You must alternate the legs as shown in the diagram
or the frame system will not be assembled correctly.
2. Once you have all 6 sections completed:
Please note: There are 6 different sections of legs.
Start laying the sections out.
Make sure that 6 like leg sections lay across from each other.
Repeat with remaining leg sections as shown in the diagram.
2.1 Have 2 people begin connecting the 6 sections together.
2.2 Once the sections are connected, the frame will form a full circle.
1.
1.1.
1.2.
2.
2.1.
2.2.
is
Summary of Contents for JK1204C1
Page 2: ...2...
Page 3: ...3 www jumpking com 12FT 3 66M TRAMPOLINE AND ENCLOSURE Model JK1204C1...
Page 6: ...6 Note The...
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ...the sharply spot...
Page 12: ......
Page 13: ...13...
Page 14: ...14...