6 Annex
76
RTD temperature probe
Resistance transmitter and resistance/potentiometer
Designation
Standard
ITS
Measuring range
Accuracy
a
Measur-
ing cur-
rent
Pt50
IEC 751:2008
ITS-90
-200 to +850 °C
≤
0.1 %
500
μ
A
Pt100
IEC 751:2008
ITS-90
-200 to +850 °C
≤
0.1 %
500
μ
A
Pt500
IEC 751:2008
ITS-90
-200 to +850 °C
≤
0.1 %
100
μ
A
Pt1000
IEC 751:2008
ITS-90
-200 to +850 °C
≤
0.1 %
100
μ
A
Pt100
JIS C 1604-1981
ITPS-68
-200 to +649 °C
≤
0.1 %
500
μ
A
Pt50
GOST 6651-2009 A.2
ITS-90
-200 to +850 °C
≤
0.1 %
500
μ
A
Pt100
GOST 6651-2009 A.2
ITS-90
-200 to +850 °C
≤
0.1 %
500
μ
A
Cu50
GOST 6651-2009 A.3
ITS-90
-180 to +200 °C
≤
0.4 %
500
μ
A
Cu100
GOST 6651-2009 A.3
ITS-90
-180 to +200 °C
≤
0.4 %
500
μ
A
Ni100
DIN 43760:1987-09
ITPS-68
-60 to +250 °C
≤
0.2 %
500
μ
A
Ni100
GOST 6651-2009 A.5
ITS-90
-60 to +180 °C
≤
0.2 %
500
μ
A
Connection type
2/3/4-wire
Ambient temperature influence
≤
50 ppm/K
Smallest measuring span
15 K
Sensor line resistance
Max. 10
Ω
per cable for two-wire circuit
Max. 30
Ω
per cable for three/four-wire circuit
Measuring range start/end
Freely programmable within the limits, in increments of 0.1 K
a
Accuracy refers to the maximum measuring range. Small measuring spans lead to reduced linearization accuracy.
Designation
Measuring range
Accuracy
a
Measuring current
Resistance transmitter
0 to 4000
Ω
≤
0.1 %
100
μ
A
Resistance/potentiometer
0 to 400
Ω
≤
0.1 %
500
μ
A
0 to 4000
Ω
≤
0.1 %
100
μ
A
Ambient temperature influence
≤
100 ppm/K
Connection type
Resistance transmitter
Three-wire circuit
Resistance/potentiometer
Two/three/four-wire circuit
Smallest measuring span
60
Ω
Sensor line resistance
Max. 10
Ω
per cable for two-wire and three-wire circuits
Resistance values
Freely programmable within the limits, in increments of 0.1
Ω
a
Accuracy refers to the maximum measuring range. Small measuring spans lead to reduced linearization accuracy.
Summary of Contents for LOGOSCREEN 700
Page 2: ......
Page 6: ...Contents...
Page 22: ...3 Mounting 22 chapter 6 1 10 Case page 82...
Page 36: ...4 Electrical connection 36...
Page 74: ...5 Operation 74...
Page 90: ...6 Annex 90...
Page 91: ......