JUMO 902442 Installation Instructions Manual Download Page 4

4

1 Safety information

1

Safety information

General information

This manual contains information that must be observed in the interest of your own safety and to avoid
material damage. This information is supported by symbols which are used in this manual as indicated.
Please read this manual before starting up the device. Store this manual in a place that is accessible to
all users at all times. 
If difficulties occur during startup, please do not intervene in any way that could jeopardize your warranty
rights! 

Warning symbols

CAUTION!

Risk of burns!

The installation process must be carried out by trained personnel.
With direct mounting, the temperature probe is immersed in the pipeline without any additional immer-
sion sleeve. During dismounting, always make sure that hot medium does not escape from the pipeline.

Drain the pipeline system or seal off the temperature probe's installation location to relieve pressure.

Summary of Contents for 902442

Page 1: ...90244261T94Z001K000 V2 00 EN 00669425 Screw connection for temperature probe installation in plastic or brass Installation Instructions...

Page 2: ......

Page 3: ...tents Contents 1 Safety information 4 2 Installation specifications for direct mounting 5 2 1 Plastic screw connection 5 2 2 Brass screw connection 6 3 Installation specifications for immersion sleeve...

Page 4: ...accessible to all users at all times If difficulties occur during startup please do not intervene in any way that could jeopardize your warranty rights Warning symbols CAUTION Risk of burns The instal...

Page 5: ...in the assembly aid to determine the probe installation length Grasp the two halves of the plastic screw directly above the assembly aid and press into the 3 re cesses beads on the temperature probe...

Page 6: ...a loosely placed slotted pin 2 Insert the back of the temperature probe into the assembly aid up to the limit stop 28 mm 3 Press in the slotted pin until it is flush with the hexagonal surface e g usi...

Page 7: ...hrough the O ring and into the measuring point and tighten the screw connection tightening torque 3 to 5 Nm when installed correctly the bottom of the hexagon sits on top of the standard compliant mea...

Page 8: ...able Important Do not mount the plastic screw connection into the recesses beading on the tempera ture probe sleeve 2 Push the plastic screw connection up to the probe tube Screw the probe into the im...

Page 9: ......

Page 10: ...ers Road East Syracuse NY 13057 USA Delivery address Mackenrodtstra e 14 36039 Fulda Germany Phone Fax Email Internet 44 1279 63 55 33 44 1279 62 50 29 sales jumo co uk www jumo co uk Phone Fax Email...

Reviews: