![Julabo FD200 Operating Manual Download Page 9](http://html1.mh-extra.com/html/julabo/fd200/fd200_operating-manual_2030660009.webp)
OPERATING PROCEDURES
20
Accessory: Clamp for cooler probe FT200/400 - order no. 8 970 400
5.3.
Tube connection FD200
•
Connect the tubes and secure with tube clamps.
discharge (9)
intake (10)
Recommended flow rate:
2 to 3 l/min
6.
OPERATING PROCEDURES
6.1.
Power connection
Caution:
•
Only connect the unit to a power socket with earthing contact (PE –
protective earth)!
•
The power supply plug serves as safe disconnecting device from the line
and must be always easily accessible.
•
Never operate equipment with damaged mains power cables.
•
Regularly check the mains power cables for material defects (e.g. for
cracks).
•
We disclaim all liability for damage caused by incorrect line voltages!
Make sure that the line voltage and frequency match the supply
voltage specified on the type plate.
Deviations of ±10 % are permissible.
www.
GlobalTestSupply
.com
Find Quality Products Online at: