background image

JUDO QUICKSOFT MEGA

19

Warranty and service

8

Warranty and service

To ensure the process operates successfully
for many years after first use, regular inspec-
tion and routine servicing of the system are
essential. Where home automation is con-
cerned, this is governed by DIN EN 806-5.
We recommend that you agree a service
contract.
A service contract is the best way of ensur-
ing correct operation even after the warranty
period has elapsed.
It is desirable that the regular maintenance
work and the supply of consumables, miner-
al solutions, salt or wear parts, etc. is per-
formed by the JUDO factory customer ser-
vice team or by an approved technical
service provider.

8.1

Inspection by the operator 

every two months (visual in-

spection)

To retain your legal warranty rights, it is nec-
essary that an inspection be performed at
least every two months.
The operator checks:
– The salt filling level.
– The leak-tightness of the softening sys-

tem (escaping water).

– For damage to the water softener. De-

fective parts must be replaced by cus-
tomer service.

– Messages on the display.
Dependent on the consumed water volume,
the corresponding salt consumption must be
regularly monitored. If necessary, replenish
the regenerating salt (only use quality ac-
cording to DIN EN 973). When replenishing
the salt take appropriate hygiene measures.
Thus, for example, the salt packs should be
cleaned before use so that no impurities can
get into the salt dissolving container. The re-
generating salt must be shaken into the salt
dissolving container directly after undoing
the packaging. In doing so, ensure that the

salt dissolving container is not overfilled and
that after completing the work, it is again
carefully closed and sealed. Do not use par-
tial packs. The salt must only be stored in
clean and dry rooms.

8.2

Six-monthly maintenance

by the operator

In addition to the checks of the 2-month in-
spection, the operator must also check the
following every six months:
– Leak-tightness of the softener to waste

water connection.
No water must flow out of the waste wa-
ter hose (see fig. 8) in the operating po-
sition.

– Salt deposits inside the water trap.

Deposits or incrustations inside the wa-
ter trap must be removed so that the
waste water does not get blocked.

– Soft water hardness.

Checking is performed with a hardness
measuring instrument (in the scope of
supply).

8.3

Annual maintenance

by customer service

Once yearly, a service must be performed
by a licensed technical service provider or
the JUDO factory customer service team.

8.3.1 Message

“Maintenance/Service”

After an operating period of one year, the
water softening system signals the required
service. The following message is output to
the display:

After performing the maintenance, the mes-
sage is reset by pressing the <OK> key for
at least 5 s.

Maintenance/
Service req.

Summary of Contents for QUICKSOFT MEGA

Page 1: ...Read before use and store Operating instructions JUDO QUICKSOFT MEGA Water softening unit Valid for EU countries and Switzerland Language English...

Page 2: ...he confidence you have shown in us by purchasing this device In purchasing this water softening system you have procured a state of the art device This device is suitable for use in cold drinking wate...

Page 3: ...JUDO QUICKSOFT MEGA 3...

Page 4: ...ee fault indication 16 5 8 Integration of the water softening system in building control systems 16 5 9 Connectivity module accessories 16 5 10 Conversions changes spare parts 17 5 11 Service repair 1...

Page 5: ...able to fulfil the instructions referred to in the installation and operating instruc tions as well as country specific regulations Alongside the operating instructions and the legal regulations appli...

Page 6: ...The water to be softened must comply with the European Drinking Water Direc tive The manufacturer supplier must be consult ed before using water of a different quality or water with additional additiv...

Page 7: ...m aged by water that escapes during regener ation or in the event of incorrect use of the water softening system If the electrical de vices installations are connected to the pow er supply it is also...

Page 8: ...mical and corrosive loads expected to be encountered in drinking water and fulfil the specifications required by DIN EN 14743 and DIN 19636 100 Water soften ing systems cation exchangers in drinking w...

Page 9: ...ter hardness Raw water hardness setting see chapter 5 3 3 Setting the raw water hardness Regeneration manual regeneration start see chapter 5 3 2 Manually starting regen eration of the water softening...

Page 10: ...re used then the salt reservoir must be cleaned at shorter intervals and the intake strainer replaced more frequently Remove the cover Enter the date of installation on the label see fig 3 Open the wa...

Page 11: ...h a reduced water volume is treated If the raw water hardness is low a greater wa ter volume is treated The water softening system is pre set to a raw water hardness of 25 e Another raw water hardness...

Page 12: ...r limit values are much higher partially greater than 1000 mg sodium per litre If the calculated total sodium content ex ceeds the valve permitted by the drinking water legislation of 200 mg l then it...

Page 13: ...JUDO QUICKSOFT MEGA 13 Operation 5 4 Menu structure Fig 6 Menu structure...

Page 14: ...available for the consumer even during regeneration 5 5 3 Regeneration With a very short regeneration period of about 7 5 minutes per resin container total 15 minutes high volume continuous draw ing i...

Page 15: ...rine concentration de creases too much a message is output to the display After this message replenishment with a quantity of 25 kg of regenerating salt is re quired Then the OK key must be briefly pr...

Page 16: ...key or to change between Nor mally open and Normally closed The chosen setting is saved by pressing OK 5 8 Integration of the water softening system in building control systems The water softening sy...

Page 17: ...or the bypass valve is switched over When disassembled the water softening system must be stored in a dry and frost free location The connection flange must be protect ed against dirt and damage Once...

Page 18: ...tion Maintenance Service req Message appears after the one year service interval has elapsed see chapter 8 3 1 Message Mainte nance Service Attention Salt deficit Message appears after exceeding of th...

Page 19: ...hygiene measures Thus for example the salt packs should be cleaned before use so that no impurities can get into the salt dissolving container The re generating salt must be shaken into the salt diss...

Page 20: ...s lower to ensure the optimum function of the water softening system Further information can be found in the in stallation instructions 1703525 for the QUICKSOFT MEGA 6 water softening unit Operating...

Page 21: ...dation Installation of a JUDO JULIA dosing pump in the mixing water pipe downstream of the water softening system so that the water can be admixed proportionally with a JUL mineral solution The JUL mi...

Page 22: ...22 JUDO QUICKSOFT MEGA Data sheet Fig 7 Electronic control unit with fault message relay...

Page 23: ...JUDO QUICKSOFT MEGA 23 Spare parts 10 Spare parts Fig 8 Spare parts JUDO QUICKSOFT MEGA 1 A 2 4 3 B 5 6 7 8 8 9 9 10 11...

Page 24: ...or 2200582 88 Spare part set injector 2201470 78 A Spare part set hoses complete 2200012 25 B Spare part set overflow connection 2202230 38 1 Power supply unit EU 24 V DC 2210506 65 2 Lance 2201855 13...

Page 25: ...JUDO QUICKSOFT MEGA 25 Notes...

Page 26: ...26 JUDO QUICKSOFT MEGA Notes...

Page 27: ...JUDO QUICKSOFT MEGA 27 Notes...

Page 28: ...bH Filiaal Filiale BeNeLux Laarbeeklaan Av du Laerbeek 72 A1 B 1090 Brussel Bruxelles Tel T l 32 0 24 60 12 88 Fax 32 0 24 61 18 85 e mail info benelux judo eu judo eu JUDO France S r L 76 Rue de la P...

Reviews: