www.modellmarkt24.ch
Elevator flat spar and h-stab flat spar shown above.
Now that rigidity is established, it is very important to break
in the hinges by flexing them all the way over and weighing
them down. Let them rest for at least 60 minutes.
www.modellmarkt24.ch