![JRC JMA-5212-4 Service Manual Download Page 100](http://html.mh-extra.com/html/jrc/jma-5212-4/jma-5212-4_service-manual_2028362100.webp)
4-44
(4) Remove the six screws that secure the GYRO/LOG I/F
circuit, and replace it.
(Phillips screwdriver for 3 mm screws)
[Mounting]
(1) Check that the DIP switch settings of the GYRO I/F circuit are correct.
Check the GYRO I/F circuit fuses.
(2) Assemble the unit in reverse order of removal.
(3) Start the equipment, and set the true bearing value.
[Operation check]
(1) Check that an error message is not displayed.
(2) The true bearing value is traced correctly. (Resolution, and rotation direction)
Summary of Contents for JMA-5212-4
Page 2: ......
Page 7: ... Chapter 1 Equipment Overview ...
Page 8: ... ...
Page 11: ... Chapter 2 Equipment Overview ...
Page 12: ... ...
Page 34: ...2 22 ...
Page 35: ... Chapter 3 Service Parts ...
Page 36: ... ...
Page 43: ...3 7 Figure 3 1 Exploded Diagram of the NKE 2103 ...
Page 47: ...3 11 Figure 3 2 Exploded Diagram of the NKE 2254 ...
Page 51: ...3 15 Figure 3 3 Exploded Diagram of the NDC 1460 Fuse nut Connector nut Connector nut ...
Page 53: ...3 17 Figure 3 4 Exploded Diagram of the NCE 7699A ...
Page 54: ...3 18 ...
Page 55: ... Chapter 4 Replacement of Major Units ...
Page 56: ... ...
Page 108: ...4 52 ...
Page 109: ... Chapter 5 Program Update ...
Page 110: ... ...
Page 114: ...5 4 ...
Page 115: ... Chapter 6 Troubleshooting ...
Page 116: ... ...
Page 150: ...6 34 ...
Page 151: ... Chapter 7 Drawings ...
Page 152: ... ...
Page 170: ......
Page 171: ......