RTU-292 Operations Manual
2.11 INSTALLATION CHECKLIST
Table 2-20
Installation Checklist
Provide suitable
Mounting and Cooling.
See
Section
2.5.
Check
AC Line
voltage selection.
See Section 2.7.
DC Operation
needed?
See Section 2.7.
Make
Interconnections.
See Section 2.9 for External Interconnect Information.
Serial Remote Control
needed?
Set Serial Remote Baud Rate with SW1-1 and 2. See RS-
232 protocol in Section 5.
Set
TX/RX Audio Levels
if necessary.
See Table 2-1 and Section 2.10.
Set
Telephone Line Levels
if necessary.
See Table 2-1 and Section 2.8.
Are other
Factory Default Settings
correct for
this system?
See Table 2-1 and Table 3-2.
Make necessary changes as explained in sections 2.8, 2.10,
and 3.7
2.12 OPTIONS INSTALLATION AND CONFIGURATION
See section 7 for installation instructions for all field-installable options. Section 7 also
explains how to set-up any options that have configuration switches, jumpers, potentiometers,
etc. For any options not covered in section 7, refer to custom notes supplied with the RTU-292
or the option, or contact JPS for information.
End of Section 2
JPS Communications, Inc.
2-24
Summary of Contents for RTU-292
Page 10: ...RTU 292 Operations Manual This page intentionally left blank JPS Communications Inc 10 ...
Page 34: ...RTU 292 Operations Manual Figure 2 1 Outline Dimensions JPS Communications Inc 2 18 ...
Page 39: ...RTU 292 Operations Manual Figure 2 6 Interface Details JPS Communications Inc 2 23 ...
Page 112: ...RTU 292 Operations Manual Blank Page JPS Communications Inc 8 2 ...