Jøtul F 100 Nordic Installation And Operating Instructions Manual Download Page 23

23

139678

-R

01

  F

 100  

May,

 2015

Pos. no.  Description 

Dim./Spec.

Side plate , left 

Cast iron 

Gasket (for rear plate) 

LD 250-2  Ø6,4x750mm

Cover for air manifold 

Cast iron 

Heat shield rear 

Smoke outlet cover 

Cast iron

Rear plate new 

Cast iron 

Gasket (for top) 

LD 375-2   Ø9,5x1620mm

Baffle 

Cast iron 

Smoke outlet, non dripless Ø125 

Cast iron 

10 

Gasket (for smoke outlet) 

LD 187-1   Ø4,8x500mm

11 

Top plate , complete 

Cast iron

12 

Inner bottom 

Cast iron 

13 

Burn plate, side 

Cast iron 

14 

Side plate , right 

Cast iron 

15 

Valve 

Cast iron BP

16 

Valve plate 

Cast iron 

17 

Gasket (for valve plate) 

LD 250-2   Ø6,4x835mm

18 

Air Deflector 

Cast iron BP

19 

Hinge pin 

Ø6x33mm

20 

Gasket (for door) 

LD 375-2   Ø9,5x1620mm

22 

Glass Clip 

0,9mm steel

24 

Gasket (for glass) 

LD 250-2   Ø6,4x1300mm

25 Glass 

379x270x4mm

26 

Spring 

4mm ceramic

27 

Spring Pin 

Ø5x24mm

28 

Latch 

Cast iron 

29 

Screw, machine pan head pozidrive 

M6x40

30 

Washer 

Ø6,4xØ12,5x1,6, St8.8

31 Sleeve 

Ø8xØ6xL27,5mm

32 

Wooden knob 

hard wood

33 

Washer, insulating 

Special

34 

Nut hexagon 

M6, St8.8

35 

Washer, black-chromated, special 

Ø10,5x25x1,5

36 

Door , complete excl/glass 

37 

Gasket (for door) 

LD V-125  Flat 8x30mm

38 

Latch bolt 

st 37

39 

Front plate 

Cast iron

40 

Ash lip packed 

Cast iron 

41 

Log/Ash retainer 

Cast iron BP

42 

Leg 155mm 

Cast iron

43 

Valve/cover plate 

Cast iron 

44 

Bottom plate 

Cast iron 

45 

Heat shield, under 

AluZn coated steel 

46 

Screw, hexagon cap  

M6x50, St8.8

47 

Screw, hexagon cap flange  

M6x25, St8.8

48 

Screw, hexagon cap flange  

M6x16, St8.8

49 

Screw, hexagon cap flange  

M6x12, St8.8

50 

Washer 

Ø8,4xØ20x1,5, St8.8

51 

Screw, machine pan head pozidrive 

M6x8

52 

Nut, cap flange 

M6, St8.8

53 

Gasket (for rear plate) 

LD V-125 Flat 8x30mm

70 

Sleeve 

For Europe

71 

Handle 

For Europe

72 

Loose handle 

For Europe

72 

Loose handle flat 

For Europe

73 

Ash pan 

For Europe

74 

Grate, (for multifuel) 

For Europe

75 

Inner bottom, rear, (for multifuel) 

For Europe

76 

Smoke outlet, dripless Ø125 new 

Cast iron

76 

Smoke outlet, dripless Ø125 UK 

Cast iron 

 

 

Only use replacement parts 

provided through your 

authorized Jøtul dealer.

Summary of Contents for F 100 Nordic

Page 1: ...Jøtul F 100 Nordic Woodburning Stove Installation and Operating Instructions Jøtul F 100 Nordic Keep these instructions for future reference ...

Page 2: ...to the Chimney Masonry Chimney 8 Hearthmount Fireplaces 8 Prefabricated Chimneys 9 4 0 Clearances to Combustibles Floor Protection 9 Clearances to Walls and Ceilings 10 Alcove Installation 10 Clearance Chart 12 Clearance Diagrams 13 5 0 Operation Combustion Efficiency 14 CO Emissions 14 Wood Fuel and Performance 14 Break in Procedure 15 Starting Maintaining the Fire 16 Formation of Creosote 16 Add...

Page 3: ... Default values per previous Federal Register 40 CFR Part 60 Subpart AAA EPA validated efficiency and CO values were unavailable at the time of this printing These values will be made available in the manual and on the Jotul website www jotul us for your reference in the near future Installation and Operation Instructions for North America Safety Notice If this solid fuel room heater is not proper...

Page 4: ...O NOT USE CHEMICALS OR FLUIDS TO START A FIRE DO NOT BURN GARBAGE OR FLAMABLE FUELS DO NOT USE A GRATE OR ELEVATE THE FIRE BUILD THE FIRE DIRECTLY ON THE HEARTH IF THIS ROOM HEATER IS NOT PROPERLY INSTALLED A HOUSE FIRE MAY RESULT TO REDUCE THE RISK OF FIRE FOLLOW THE INSTRUCTIONS IN THIS MANUAL FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RE SULT IN PROPERTY DAMAGE BODILY INJURY OR LOSS OF LIFE CONTA...

Page 5: ...ors must be accessible for cleaning Where passage through a wall or partitionofcombustibleconstructionisdesired the installation must conform with NFPA 211 or CAN CSA B365 and is also addressed in this manual Do not connect this stove to a chimney flue servicing another appliance Install the Ashlip Attach the ashlip to the front by engaging the center tab with the slot located under the front door...

Page 6: ...ney with a ceramic tile or listed steel flue liner 2 A prefabricated chimney complying with the requirements forType HT 2100 F chimneys per UL 103 or ULC S629 The chimney size should not be less than the cross sectional area of the flue collar and not more than three times greater than the cross sectional area of the flue collar When selecting a chimney type and the location for the chimney in the...

Page 7: ... install headers and construct a sill frame to maintain the proper dimensions and to support the weight of the brick The bricks must be solid brick with a minimum of 3 inches thick nominal 4 102 mm Refractory mortar must be used at the junction of the chimney and the pass through liner The pass through liner must not penetrate the chimney liner beyond the inner surface of the chimney liner Use ext...

Page 8: ...stalled into a masonry fireplace with a minimum opening height of 22 1 2 572 mm Building code requires that the fireplace damper plate be removed or securely fixed in the open position A connector pipe must then extend from the stove s flue exit through the damper area of the fireplace and into the chimney tile liner See figure 7 The inside area of the flue liner must not be less than the area of ...

Page 9: ...bottom heat shield All forms of protection must include a noncombustible surface extending forward from the glass panel at least 16 for the U S or 18 46cm for Canada Protection must extend 8 21 cm from the sides and rear for both the U S and Canada This will result in a minimum floor protection of 37 W x 38 D for the U S or 37 W x 40 D for Canada See figure 9 In a rear vent installation the floor ...

Page 10: ...r Chimneys Fireplaces Vents and Solid Fuel Burning Appliances for acceptable materials proper sizing and construction guidelines In Canada refer to CAN CSA B365 Installation Code for Solid Fuel Burning Appliances and Equipment also for acceptable materials proper sizing and construction guidelines Notice Many manufacturers have developed woodstove accessories that permit clearance reduction Use on...

Page 11: ...11 139678 R01 F 100 May 2015 This page is intentionally blank ...

Page 12: ...cted Surface Protected Surface Vertical Installation per NFPA211 or CAN CSA B365 M93 Single wall Connector 11 280 mm 6 153 mm Single wall Connector with Connector Shields 8 203 mm 5 127 mm or Double wall Connector Chimney Connector Unprotected Surface Protected Surface Horizontal Installation per NFPA211 or CAN CSA B365 M93 Single wall Connector 18 457 mm 12 305 mm Double wall Connector Manufactur...

Page 13: ... The Wall PER NFPA 211 or CAN CSA B365 Unprotected Surface Corner Installation Important Connector heatshields and double wall pipe must be a listed product Always follow the manufacturer s instructions A E F B D G H C M M K K Protected Surface Corner Installation PER NFPA 211 or CAN CSA B365 J J L L ...

Page 14: ... will provide the cleanest most efficient heat Wood seasoned more than 2 years will burn too quickly to take advantage of the stove s low end efficiency strength A seasoned log will have check marks on the ends and be lighter than an unseasoned log which will show little or no check marks We recommed using a moisture meter to determine the moisture content of your wood For purposes of home heating...

Page 15: ...e 1 Light a small fire of newspaper and kindling Only allow the stove to reach a maximum surface temperature of 200 F 93 C Burn for approximately 1 hour 2 Allow the stove to cool to room temperature 3 Light a second fire allowing the stove to reach a maximum temperature of 300 F 149 C for 1 hour 4 Cool the stove to room temperature 5 Light a third fire and gradually allow the stove to reach a surf...

Page 16: ... of a slow burning fire The creosote that accumulates in the flue is highly flammable and is the fuel of chimney fires To prevent a chimney fire the creosote needs to be removed by sweeping the chimney and flue connector The frequency of sweeping will depend on how you operate your stove An accumulation of 1 4 or more on the sides of the flue or connectorisconsideredhazardousandshouldberemoved Int...

Page 17: ... spill over the Ash Fettle For your protection always wear safety gloves when handling the ashes Use an ash shovel to remove the accumulation from the bottom of the firebox The Fettle may be lifted from the front of the firebox to aid in ash removal Ashes should only be placed in a metal container equipped with a tight sealing lid The container should be placed on a noncombustible floor or on the ...

Page 18: ...an be easily removed the seal is too loose Check several spots around the door Gasket Replacement 1 Use pliers and a putty knife to remove the old gasket from the door 2 Thoroughly clean the channel with a wire brush 3 Apply a small bead of cement to the channel 4 Gently press the new gasket into the cement to seat it in the channel Close and latch the door and then reopen Wipe away any excess cem...

Page 19: ... and is solely for the benefit of the original retail purchaser of theJøtulorScanStoveorFireplaceInsert Thisparagraph sets forth the sole remedy available under this warranty in the event of any defect in the Jøtul Scan Stove or Fireplace Insert The warranty period for any replaced component will be the remaining unexpired portion of the warranty period for the original component Please retain you...

Page 20: ...limited exclusively to the cost of furnishing a replacement component JØTUL may at its discretion discharge all obligations by refunding the wholesale price of any defective part or appliance JØTUL shall in no event be liable for any special indirect or consequential damage of any nature which is in excess of the original wholesale purchase price of the product JØTUL shall not in any event be liab...

Page 21: ...21 139678 R01 F 100 May 2015 This page is intentionally blank ...

Page 22: ... 47 2 48 2 48 4 45 1 38 1 37 1 32 1 31 1 33 1 35 1 51 2 34 1 36 1 40 1 41 1 39 1 44 1 43 1 42 4 Fredrikstad Norway Jøtul F 100 Part list Delliste 1 1708 P02 Draw no 49 2 17 1 52 1 16 1 18 1 15 1 46 1 12 1 48 2 48 1 50 4 48 2 49 2 10 1 9 1 48 2 13 2 14 1 11 1 22 2 25 1 24 1 20 1 26 1 28 1 29 1 27 1 30 1 19 2 10 0 Jøtul F 100 Illustrated Parts Breackdown ...

Page 23: ... St8 8 31 Sleeve Ø8xØ6xL27 5mm 32 Wooden knob hard wood 33 Washer insulating Special 34 Nut hexagon M6 St8 8 35 Washer black chromated special Ø10 5x25x1 5 36 Door complete excl glass 37 Gasket for door LD V 125 Flat 8x30mm 38 Latch bolt st 37 39 Front plate Cast iron 40 Ash lip packed Cast iron 41 Log Ash retainer Cast iron BP 42 Leg 155mm Cast iron 43 Valve cover plate Cast iron 44 Bottom plate ...

Page 24: ...otul us Weappreciateyour trust inwelcomingourproduct intoyourhomeandinviteyourcomment and appraisal of our efforts to provide you with the finest in home hearth products Jøtul North America Inc pursues a policy of continuous product development Products may therefore differ in specification colour and type of accessories from those illustrated and described in this manual ...

Reviews: