OPERATION
The AIS BS includes a transponder to be used in a configuration with a Base Station Controller
(BSC)
Figure 5, TR-2600 AIS BS
5.1
Connecting power
After connecting the antennas and Inputs/Outputs, the DC power can be connected to the TR-2600
transponder through the AC/DC Power supply unit, PSU-7002 in the rack. This PSU transform
from 115-230V AC to 28 V DC. An optional DC input is provided in the PSU-7002 , if automatic
switchover to 24V DC is needed. The DC input voltage must be within 24VDC +30% / -10%. The
power consumption is 60W.
At startup, the TR-2600 will look for connected sensors and equipment for 20 –30 seconds. The
display will show:
After a while the alarm status will be indicated. Press [Del] key to reset the alarm settings.
Loading …
Please wait
Summary of Contents for TR-2600
Page 1: ...OPERATION AND INSTALLATION MANUAL www jotron com TR 2600 AIS BASE STATION...
Page 53: ...82695_Op Ins MAN_TR2600_K 10 1 10 OUTLINE DRAWINGS 10 1 TR 2600 AIS BASE STATION...
Page 54: ...82695_Op Ins MAN_TR2600_K 10 2 10 2 TR 2600 AIS Transponder...
Page 55: ...82695_Op Ins MAN_TR2600_K 10 3 10 3 Procom CXL 2 1 l Maritime VHF Antenna with FLG Bracket...
Page 56: ...82695_Op Ins MAN_TR2600_K 10 4 10 4 Procom GPS 4 Antenna...
Page 61: ...82695_Op Ins MAN_TR2600_K 11 2...