background image

49

JO

NIX 

steel

JX70000004

JX40000021

JX40000009

JX11000002

JX40000025

JX40000040

JX40000039

JX03000023

70CONDTIPO175

70CONDTIPO175

JO

NIX

 steel 2C

JO

NIX

 steel 4C

EXPLODED 

JO

NIX

 

steel 2C/4C

Summary of Contents for steel 1C

Page 1: ...MADE IN ITALY JONIX steel AIR PURIFICATION DEVICE WITH ADVANCED COLD PLASMA TECHNOLOGY USE AND MAINTENANCE MANUAL...

Page 2: ...ONIX srl reserves every right concerning this manual including the right to make any necessary change or improvement to its products and to the manual at any time and without notice It is forbidden to...

Page 3: ...ON 13 5 4 STORAGE 13 5 5 Handling DEVICE in operating conditions 13 6 INSTALLATION AND COMMISSIONING 14 6 1 SAFETY STANDARDS 14 6 2 GETTING STARTED 16 6 3 CHOOSING THE INSTALLATION SITE 16 6 4 INSTALL...

Page 4: ...liability in case of personal injury or property damage resulting from any improper use of the device or from the failure to observe the use and safety instructions specified in this manual In any su...

Page 5: ...s It is therefore strictly forbidden to use the device in environments where the air is mixed with and or altered by other gaseous compounds and or solid particles Using the device for purposes other...

Page 6: ...y that sold you the device 2 WARNINGS AND GENERAL PROHIBITIONS HAZARD It refers to dangerous situations that may result from the use of the device in order to ensure personal safety WARNING It refers...

Page 7: ...of the device Please note that the use of products that require electricity involves the observance of some crucial safety rules such as When installing commissioning and operating this product it is...

Page 8: ...physical process of ionisation promotes the controlled formation of particular ionic species electrically charged species in the air through an electrostatic field that simulates the natural process t...

Page 9: ...mpling through contact plates method In order to obtain a comparative analysis it is suggested to carry out three cycles of sampling in three different days of the week before the devices are started...

Page 10: ...ter 09 Electrical compartment 04 Cover in AISI 304 stainless steel 10 Power cable exit 05 Pre punched slots wall plate 11 ON OFF luminous switch 06 Ionising tube and earthing bracket 4 1 COMPONENT DES...

Page 11: ...stainless steel 12 Alarm reset button 06 Pre punched slots wall plate 13 Led signal for malfunction 07 Ionising tube and earthing bracket JONIX steel 2C n 2 JONIX steel 4C n 4 14 Led signal for mainte...

Page 12: ...t 71KT000002 N 2 GENERATORS 520 SPARE PART KIT N 2 Ionising tubes long JX40000002 PROTECTION FUSE 1 quick blow glass fuse 5x20 1A F 4 4 SPARE PARTS AVAILABLE ON ORDER 01 Cover fixing screw 09 Switch b...

Page 13: ...delivery note and specifying the type of damage 5 3 INSPECTION UPON RECEPTION in JONIX steel 2C 4C 2F 4F versions the ionised tubes equipped are disassembled and packed in their boxes 5 2 HANDLING AND...

Page 14: ...roducts used for cleaning and servicing the device you should also observe the recommendations given by the manufacturer of such products Before switching the device on check the integrity of the vari...

Page 15: ...t is made with high strength materials the parts of the device can be damaged if handled incorrectly Do not try to perform maintenance work on the device except where specified in this manual Opening...

Page 16: ...at can damage the various components beyond repair Provide a minimum clearance in order to install the device and carry out routine and special maintenance JONIX steel device is designed to be directl...

Page 17: ...hap Technical data and the type of wall it is installed on Gently screw the ionising tube holding on to the base green part If the operation is difficult to perform pull slightly the earthing bracket...

Page 18: ...ideal for every kind of environment ambient air ionised air flow HORIZONTAL WALL FIXING It can be used as an alternative to the vertical fixing optimizing the space available CEILING FIXING It can be...

Page 19: ...t The electrical connections must be carried out following the instructions provided in this manual Make sure that voltage and frequency of the electric line correspond to those provided on the name p...

Page 20: ...a generic overview of the times needed to reach and maintain the maximum sanitisation level depending on the size of the relevant room Model Floor area m3 Time needed for sanitation Recommended daily...

Page 21: ...duty of the user to perform all the maintenance operations on the device listed below If you experience a malfunction unplug the device from the mains and contact qualified staff retailer the Manufac...

Page 22: ...ce off by turning the luminous On Off switch to O Fig 03 Unscrew the fixing screw and remove the frontal cover from the device If the operation is difficult to perform pull slightly the earthing brack...

Page 23: ...s or other damage otherwise it must be replaced As soon as you notice a whitish layer on the perforated metal plate inside the glass it means that the ionising tube needs replacing The tubes must usua...

Page 24: ...o not overtighten the screw after reaching its end stop Check that the earthing spring is in contact with the outer mesh once the ionising tubes have been screwed back into place Otherwise contact the...

Page 25: ...the fan will be perceived It should be remembered that failure to clean the ionising tubes when indicated by the device leads to a drop in system performance Remove the plug connected to the mains 7...

Page 26: ...If the operation is difficult to perform pull slightly the earthing bracket so that it does not make contact with the surface of the tube ATTENTION do not overtighten the screw after reaching its end...

Page 27: ...als the need for maintenance yellow indicator turns off and the LED that signals the proper functioning turns on green indicator Monitor the functioning of the device a slight noise coming from the io...

Page 28: ...connected to the mains Fig 18 Switch the device off by turning the luminous On Off switch to O Fig 19 Unscrew the fixing screw and remove the frontal cover from the device In JONIX steel 2F 4F versio...

Page 29: ...ently unscrew the ionising tubes using the green plastic base If the operation is difficult to perform pull slightly the earthing bracket so that it does not make contact with the surface of the tube...

Page 30: ...oes not make contact with the surface of the tube ATTENTION do not overtighten the screw after reaching its end stop Check that the earthing spring is in contact with the outer mesh once the ionising...

Page 31: ...ld be remembered that failure to clean the ionising tubes when indicated by the device leads to a drop in system performance Fig 24 Reconnect the power plug In order to turn on the device act on the s...

Page 32: ...rd grille fitted at the bottom of the device Fig 29 Put the filter back into the filter cover Fig 30 Reassemble the filter cover with the snap fastening Press it onto the bottom of the device until th...

Page 33: ...ial LED the need to replace the ionising tubes approximately every 14000 hours of operation 7 3 SPECIAL MAINTENANCE In JONIX steel 2C 4C 2F 4F versions substitute the ionising tubes every time the spe...

Page 34: ...ATTENTION do not overtighten the screw after reaching its end stop Check that the earthing spring is in contact with the outer mesh once the ionising tubes have been screwed back into place Otherwise...

Page 35: ...cleaners or sprays soap or the like Fig 36 Reconnect the power plug In order to turn on the device act on the switch 0 I turning it to I The button will illuminate a slight noise coming from the ioni...

Page 36: ...tubes JONIX steel 2C 4C Fig 37 Switch the device off by turning the luminous On Off switch to O In JONIX steel 2C 4C versions clean the ionising tubes every time the specific LED lights up permanent y...

Page 37: ...0 Screw delicately the ionising tube holding on to the base green part If the operation is difficult to perform pull slightly the earthing bracket so that it does not make contact with the surface of...

Page 38: ...ls the need for maintenance yellow indicator turns off and the LED that signals the proper functioning turns on green indicator Monitor the functioning of the device a slight noise coming from the ion...

Page 39: ...tubes JONIX steel 2F 4F Fig 44 Switch the device off by turning the luminous On Off switch to O In JONIX steel 2F 4F versions clean the ionising tubes every time the specific LED lights up permanent y...

Page 40: ...r to facilitate the operation If the operation is difficult to perform pull slightly the earthing bracket so that it does not make contact with the surface of the tube Fig 46 Gently unscrew the ionisi...

Page 41: ...oes not make contact with the surface of the tube ATTENTION do not overtighten the screw after reaching its end stop Check that the earthing spring is in contact with the outer mesh once the ionising...

Page 42: ...n indicator Monitor the functioning of the device a slight noise coming from the ionising tube has to be heard and the air flow generated by the fan will be perceived It should be remembered that fail...

Page 43: ...ubes and fan mesh filter need cleaning Follow the instructions in section 7 3 Extraordinary Maintenance JONIX steel 2C 4C 2F 4F it is not heard any noise coming from inside the module and the LED indi...

Page 44: ...UNCTION JONIX steel 2C 2F 4C 4F In the event that a device malfunction persists unplug it from the mains and contact qualified staff Before contacting customer services carry out the checks listed in...

Page 45: ...e through your municipal authorities as to the location of the eco friendly waste management sites where waste can be received for disposal and its subsequent recycling as recommended Furthermore plea...

Page 46: ...tems that are damaged or faulty due to replacement of components or accessories with others of a type that is not explicitly approved by the manufacturer interventions carried out by unauthorised or u...

Page 47: ...o o Select the model to which the declaration refers to product code xxx serial n xxx F U L F I L S to the requirements of the Machinery Directive 2006 42 EC reference standard EN 12100 2010 EN 60204...

Page 48: ...48 JONIX steel JX70000004 JX40000021 70CONDTIPO175 JX40000039 JX03000022 JX40000019 JX40000025 ATTACHMENTS EXPLODED JONIX steel 1C...

Page 49: ...49 JONIX steel JX70000004 JX40000021 JX40000009 JX11000002 JX40000025 JX40000040 JX40000039 JX03000023 70CONDTIPO175 70CONDTIPO175 JONIX steel 2C JONIX steel 4C EXPLODED JONIX steel 2C 4C...

Page 50: ...steel 2F JONIX steel 4F 70CONDTIPO520 JX03000024 JX11000002 JX40000025 JX70000004 JX40000021 JX40000040 JX40000039 JX55000048 70CONDTIPO520 JX55000049 JX70000004 JX40000021 JX40000009 JX40000010 EXPLO...

Page 51: ...51 JONIX steel 375 140 0 1 150 190 OVERALL DIMENSIONS JONIX steel 1C ambient air ionised air flow...

Page 52: ...52 JONIX steel 260 250 10 310 400 OVERALL DIMENSIONS JONIX steel 2C 4C ambient air ionised air flow...

Page 53: ...53 JONIX steel 260 250 10 310 750 OVERALL DIMENSIONS JONIX steel 2F 4F ambient air ionised air flow...

Page 54: ...ELECTRICAL DIAGRAMS JONIX steel 1C...

Page 55: ...PROTECTION gG FUSE TYPE MIN SUGGEST CROSS SECTION LINE mm VS MAX LENGTH m AIR TEMPERATURE 30 C MULTICORE CABLE CABLE INSIDE TUBE ON AIR PVC INSULATED EPR G7 G10 INSULATED CABLE WORKING TEMPERATURE 70...

Page 56: ......

Page 57: ......

Page 58: ......

Page 59: ......

Page 60: ......

Page 61: ......

Page 62: ......

Page 63: ...ELECTRICAL DIAGRAMS JONIX steel 2C...

Page 64: ...ROTECTION gG FUSE TYPE MIN SUGGEST CROSS SECTION LINE mm VS MAX LENGTH m AIR TEMPERATURE 30 C MULTICORE CABLE CABLE INSIDE TUBE ON AIR PVC INSULATED EPR G7 G10 INSULATED CABLE WORKING TEMPERATURE 70 C...

Page 65: ......

Page 66: ......

Page 67: ......

Page 68: ......

Page 69: ......

Page 70: ......

Page 71: ...ELECTRICAL DIAGRAMS JONIX steel 4C...

Page 72: ...ROTECTION gG FUSE TYPE MIN SUGGEST CROSS SECTION LINE mm VS MAX LENGTH m AIR TEMPERATURE 30 C MULTICORE CABLE CABLE INSIDE TUBE ON AIR PVC INSULATED EPR G7 G10 INSULATED CABLE WORKING TEMPERATURE 70 C...

Page 73: ......

Page 74: ......

Page 75: ......

Page 76: ......

Page 77: ......

Page 78: ......

Page 79: ...ELECTRICAL DIAGRAMS JONIX steel 2F...

Page 80: ...ROTECTION gG FUSE TYPE MIN SUGGEST CROSS SECTION LINE mm VS MAX LENGTH m AIR TEMPERATURE 30 C MULTICORE CABLE CABLE INSIDE TUBE ON AIR PVC INSULATED EPR G7 G10 INSULATED CABLE WORKING TEMPERATURE 70 C...

Page 81: ......

Page 82: ......

Page 83: ......

Page 84: ......

Page 85: ......

Page 86: ......

Page 87: ...ELECTRICAL DIAGRAMS JONIX steel 4F...

Page 88: ...ROTECTION gG FUSE TYPE MIN SUGGEST CROSS SECTION LINE mm VS MAX LENGTH m AIR TEMPERATURE 30 C MULTICORE CABLE CABLE INSIDE TUBE ON AIR PVC INSULATED EPR G7 G10 INSULATED CABLE WORKING TEMPERATURE 70 C...

Page 89: ......

Page 90: ......

Page 91: ......

Page 92: ......

Page 93: ......

Page 94: ......

Page 95: ......

Page 96: ...588511 fax 39 049 9588522 via Tegulaia 10 b 56121 Pisa Italy tel 39 050 985165 via Romagnoli 12 a 40010 Bentivoglio BO Italy JONIX srl support jonixair com www jonixair com Registered office Scientifi...

Reviews:

Related manuals for steel 1C