34
JO
NIX
steel
34
33
Fig. 34: Screw delicately the ionising tube
holding on to the base (green part).
If the operation is difficult to perform, pull
slightly the earthing bracket so that it does
not make contact with the surface of the
tube.
aTTenTIon: do not overtighten the screw
after reaching its end stop.
check that the earthing spring
is in contact with the outer
mesh once the ionising tubes
have been screwed back into
place. otherwise contact the
manufacturer.
If the operation is difficult
to perform, pull slightly the
earthing bracket so that it does
not make contact with the
surface of the tube
.
Fig. 33: Gently unscrew the ionising tubes,
using the green plastic base.
Summary of Contents for steel 1C
Page 54: ...ELECTRICAL DIAGRAMS JONIX steel 1C...
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ...ELECTRICAL DIAGRAMS JONIX steel 2C...
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ...ELECTRICAL DIAGRAMS JONIX steel 4C...
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ...ELECTRICAL DIAGRAMS JONIX steel 2F...
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ...ELECTRICAL DIAGRAMS JONIX steel 4F...
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......