INSTALLATION
MANUAL
Jolywood N-type Mono-crystalline Double Glass Module
M6 Double-glass module(HD120N/P & HD144N/P)
All rights reserved © Jolywood (Taizhou) Solar Technology Co., Ltd
Page 1: ...INSTALLATION MANUAL Jolywood N type Mono crystalline Double Glass Module M6 Double glass module HD120N P HD144N P All rights reserved Jolywood Taizhou Solar Technology Co Ltd...
Page 2: ...tallation Installation Safety Mechanical installation and precautions Framed Bifacial Double Glass Modules installation with clamps Grounding Electrical installation Wiring Fuse Maintenance for PV Mod...
Page 3: ...er required relevant professional knowledge and the system must be installed and maintained by quali ed person with professional knowledge Please store this guide in a safe place for future reference...
Page 4: ...by quali ed person with professional knowledge Persons without authorization and relevant training should not touch modules and approach the installation area or module storage area Do not connect the...
Page 5: ...irectly on the module during transportation Improper transportation or installation also may damage module which is excluded from the warranty Do not stand climb walk or jump on unpacked pallets of mo...
Page 6: ...on a relatively at ground to avoid package damage or dumping due to ground deformation or collapse Storage requirements humidity 85 temperature range 40 50 If the modules need long distance transport...
Page 7: ...rly xed The ground needs to be at enough to ensure package could be placed horizontally and stably Supportive tool should be used when disassembling the carton to prevent the modules from falling down...
Page 8: ...during installation Do not open the electrical connection or pull out the connector while the circuit is under load Do not touch the modules during installation unless necessary Glass surfaces and bra...
Page 9: ...e 5 1 9 The application level of module produced by Jolywood is Class A modules with di erent color should be avoided from installed in the same array or roof Mounted with 4 clamps along long frame C...
Page 10: ...350 30mm maximum test load front 5400Pa back 2400Pa JW HD120N P Mounted with 4 clamps along short frame C shaped steel parallel to the short frame Edge Clamp width 40 50mm height 30mm A 250 30mm maxim...
Page 11: ...holes on the back of the module frame are installed on the support structure with Mounted with 4 clamps along long frame C shaped steel parallel to the long frame Edge Clamp width 40 50mm height 30mm...
Page 12: ...a and the recommended torque is 16 Newton m 5 2 3 4 The outer at washer needs to use M8 A2 70 a stainless steel SUS304 at washer with an outer diameter of 20 2 mm and a thickness of 1 1 1 2 mm the cor...
Page 13: ...ed in accordance with the appropriate National Electrical Code The grounding conductor or grounding wire could be made with copper copper alloy or other material which should also be in accordance wit...
Page 14: ...of modules connected wrong may lead to irreparable damage Before modules connected in parallel please check the voltage and polarity of each module array If the polarity of products is opposite or Vo...
Page 15: ...wn in Figure 2 Connecting modules in series in Parallel by inserting the positive terminal of one module into the negative terminal of the next module The number of modules connected in series or in p...
Page 16: ...free from damage and rust free ensure that the mountings properly tightened check all cables to make sure they are tight 6 2 3 It is forbidden to use WD 40 or various organic solvents to wipe all part...
Page 17: ...ules under special weather wind level greater four heavy rain or heavy snow c During cleaning the water pressure on the surface of module glass shall not exceed 4MPa and the module is not allowed to w...
Page 18: ...ash accumulation there is no obvious scratch on the surface of module No cracking occurs on the surface of module 6 3 3 Troubleshooting If module does not work after installation please notify the ins...